Chhattisgarh Tenders | CPWD Tenders Chhattisgarh
Chhattisgarh government tenders
- Infrastructure Building


LOCATION SUMMARY DEADLINE
Chhattisgarh Essential Civil Modification & Renovation Works In Partportion Of First Floor For Proposed Cld Including Construction Of Attached Toilet For R.o. Head Chamber & Modification Of Existing Store Room Into Ladies & Gents Toilet Block At Ground Floor For Renti
Estimated Cost :806856 INR
30 Apr 2024
Chhattisgarh S & T Works In Connection With 1)construction Of Health Unit At Brjn, (2)augmentation Of Electric Loco Training Centre, Uslapur By Constructing Additional 08 Class Room And 01 Bath Room, Upgradation Of Conference Room And Recreation Room And Provision Of
Estimated Cost :2193743 INR
20 May 2024
Chhattisgarh Creation Of Infrastructure And Test Up Facilities For Homing Of Electric Locomotives At Diesel Loco Shed , Raipur 2. Provision Of Air Conditioning System At Balance Portion Of Drm Complex Raipur. (civil Portion Only)
Estimated Cost :17222036 INR
16 May 2024
Chhattisgarh Construction Of Building For Caaqms For Compliance Of Cto Condition At Saraipali Ocp Of Korba Area.
Estimated Cost :1418872 INR
04 May 2024
Chhattisgarh Repair And Renovation Of Bathrooms At Room No 1, 2 And Dining At Transit Camp Of Bishrampur Area.
Estimated Cost :802600 INR
04 May 2024
Chhattisgarh Repairing/ Renovation Of Surface Bunker Of Pandavpara Mine Of Jhilimili Sub Area.
Estimated Cost :914391 INR
06 May 2024
Chhattisgarh Construction of Permanent O and M Store Building in Power House Area of Ntpc-tvhpp , Joshimath, Uttarakhand
30 Apr 2024
Chhattisgarh Soil Investigation For Construction Of Bsl-3 Laboratory At Aiims- Raipur.
29 Apr 2024
Chhattisgarh Construction Of Various Associated Facilities Like Watering Facility,bore Well And Sump, Approach Road Etc In Connection With Rgm Siding And Provision Of Replacement Of Pressure Filter, Associated Water Distribution System And Construction Of One Room For
Estimated Cost :12673283 INR
15 May 2024
Chhattisgarh Carrying Out Structural Stability Tests On 02 Nos Surface Bunker 100 Tonne Each Gantry Structure Of Chp 01 No Underground Steel Bunker 150 Tonne Structure Installed At Kurasia Ug Mine Of Kurasia Sub Area Chirimiri. Qty : 1
Estimated Cost :1683919 INR
01 May 2024