Government Tenders in Bihar | Bihar Govt Road Tenders
Bihar government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Bihar Fabrication And Erection Of Gates , Embeaded, Hoisting Arrangement, , Hoist Bridge & Approch Ladder At Bela -14.00 Km R/e In Jhim River Right Embankment And Banarjhula -5.88 (l/e) Surhaihiya -15.90 (l/e) In Jhim River Left Embankment Under Bagmati Divisio
Estimated Cost :1742436 INR
04 May 2024
Bihar Supplying , Fabrication And Erection Of Hoisting Bridge, Hoisting Arrangement And Approch Ladder In Sultanpur Ghat Link Channel Rd -17.00 Under Water Drainge Division.
Estimated Cost :1911252 INR
04 May 2024
Bihar Fabrication And Erection Of Gates, Embeaded, Hoisting Arrangement, Wellcover, Hoist Bridge At Fulwaria - 1.33km(r/s), Madhu Chhapra-8.94km(r/s), Jhikahiya -14.22 Km In Lalbekiya Right Embankment, & Goabari -2.34 Km In Marginal Bandh And General Maintaenan
Estimated Cost :1663433 INR
04 May 2024
Bihar Construction Of Bridge (three Vent) At 6.54 Km Of Badsahi Nala Nand Bihar Colony, Vidya Nagar, Beur. (agenda No 212/16/2024)
Estimated Cost :4538795 INR
30 Apr 2024
Bihar Electrical Work In Connection With At Narkatiaganj- Provision Of 12m Wide Fob With Ramp For Development Of Station Under Amrit Bharat Station Scheme.
Estimated Cost :1347962 INR
16 May 2024
Bihar Provision Of 12m Wide Foot Over Bridge At Barsoi Under Division.
Estimated Cost :87336453 INR
20 May 2024
Bihar Design And Construction Of Twin Tunnel By Shield Tbm, Tunnel By Cut And Cover, Underground Ramp At Mithapur And Three Underground Metro Including Architectural Finishing, Ws, Si And Dw Of Stations Of Phase-i Of Patna Mrts.
31 May 2024
Bihar Construction Of Bridge Of Badsahi Nala Nand Bihar Colony.
Estimated Cost :4539000 INR
30 Apr 2024
Bihar Provision Of Limited Height Subway At Trespass Location At Km 05/08-10 Between Pnbe- Prbz, Km 08/21-23 Between Prbz-ppn, Km 09/21-23 Between Prbz-ppn In Patna- Gaya Section And Provision Of Rcc Fob With Ramps At Trespass Location At Km 25/05-07 Between In
Estimated Cost :259797565 INR
08 May 2024
Bihar Construction Of Rob & Its Approaches In Lieu Of L.c. No.- 29 On Amba Nabinagar To Koiridih (tetariya More) Road, Mdr, Between Station Nabinagar Kajrat Nawadih, At Rly. Km. - 381/3 381/5.
Estimated Cost :477500000 INR
15 May 2024