Government Tenders in Bihar | Bihar Govt Road Tenders
Bihar government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Bihar Design And Construction Of Twin Tunnel By Shield Tbm, Tunnel By Cut And Cover, Underground Ramp At Mithapur And Three Underground Metro Including Architectural Finishing, Ws, Si And Dw Of Stations Of Phase-i Of Patna Mrts.
31 May 2024
Bihar Electrical Work In Connection With At Narkatiaganj- Provision Of 12m Wide Fob With Ramp For Development Of Station Under Amrit Bharat Station Scheme.
Estimated Cost :1347962 INR
16 May 2024
Bihar Provision Of 12m Wide Foot Over Bridge At Barsoi Under Division.
Estimated Cost :87336453 INR
20 May 2024
Bihar Construction Of Bridge Of Badsahi Nala Nand Bihar Colony.
Estimated Cost :4539000 INR
30 Apr 2024
Bihar Aerial Topographical Survey
Aerial Topographical Survey Using Dgps Based Integrated Drone And Other Field Works For Final Location Survey For 116 Nos. Rob/rub/lhs/subways Of East Central Railway-under , Bihar

29 Apr 2024
Bihar Aerial Topographical Survey Using Dgps Based Integrated Drone And Other Field Works For Final Location Survey For 116 Nos. Rob/rub/lhs/subways Of East Central Railway-under, Bihar.
29 Apr 2024
Bihar Provision Of Limited Height Subway At Trespass Location At Km 05/08-10 Between Pnbe- Prbz, Km 08/21-23 Between Prbz-ppn, Km 09/21-23 Between Prbz-ppn In Patna- Gaya Section And Provision Of Rcc Fob With Ramps At Trespass Location At Km 25/05-07 Between In
Estimated Cost :259797565 INR
08 May 2024
Bihar Construction Of Rob & Its Approaches In Lieu Of L.c. No.- 29 On Amba Nabinagar To Koiridih (tetariya More) Road, Mdr, Between Station Nabinagar Kajrat Nawadih, At Rly. Km. - 381/3 381/5.
Estimated Cost :477500000 INR
15 May 2024
Bihar Construction Of High Level Rcc Bridge (3x14.50m) In 10th Km Of Ujjan-ghanshyampur Road.
Estimated Cost :86282000 INR
16 May 2024
Bihar Resetting Of Pontoon Bridge After Repair And Supplying Of Necesaary Iron Material And Maintenance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26, 2026-27 & 2027-28 (upto Maintenance Period) Dismentling Of Pontoon Bridge For The
Estimated Cost :165561000 INR
29 Apr 2024