Assam Tenders | PWD Assam Tenders | Assam Govt Tenders
Assam government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Assam Maintenance Of Certain Roads At North Of Railway Line And Rekhamari Area Under Ge
Estimated Cost :13800000 INR
11 Jun 2024
Assam Rfp For Independent Engineer Services For Supervision Of Construction Of 4 (four) Lane With Paved Shoulder For Existing As Well As Greenfield Alignment (d. Ch. 87.700 Km To D. Ch. 106.500km) Of Chandkhira Village – Churaibari Section Of Nh-8 In The State
20 May 2024
Assam Prep Of Sub Grade, Providing, Laying And Compaction Of Gsb In 150 Mm, Wmm 75 Mm, Wmm 100 Mm Dbm 50 Mm, Bc 30 Mm, Earth Work In Embankment, Road Stud, Delineators And Road Marking Bet Km 0 To 8 For Surf Works On Road Dong-jachep Of 116 Rcc Sector
Estimated Cost :117769000 INR
12 Jun 2024
Assam Maintenance Of Sewer Network Of Zone I, Ii And Footpath, Culvert, Boundary Wall, Fencing, Drainage, Hardstanding, Parking Of Zone I Under Aor Of Age Br-i Under Ge
Estimated Cost :4000000 INR
03 Jun 2024
Assam Rfp For Independent Engineer Services For Supervision Of Construction Ofconstruction Of 4-lane Of Nh-8 Form Design Ch. 62.800 (start Of Proposed Nilambazar/cheragi Bypass) To Design Ch. 87.700 Near Chandkhira Village On Silchar-churaibari Pkg-5 In The Sta
20 May 2024
Assam Rfp For Independent Engineer Services For Four Laning Of Badarpur – Churaibari Section Ofnh-37 & Nh-8 From Design Chainage 38.600(end Of Proposed Badarpur Bypass) To Km.62.800 (start Of Proposed Nilambazar/cheragi Bypass) In The State Of Assam (package-iv
20 May 2024
Assam Improvement Of Approach Road To Weigh Bridge Including Repairing Of Neepco Colony Road At Khps, Umrongso, Dima Hasao, Assam.
Estimated Cost :1984707 INR
10 Jun 2024
Assam Rfp For Construction Of Balance Work Of The 4-laning Of The Section From Jhanji To Demow Of Nh-37 (old): Pkg-iii: Road Works From Km 514+800 To Km 534+800 (20.000 Km), Under Sardp- Ne , Under Epc Mode In The State Of Assam
17 May 2024
Assam Construction Of Plinth, Approach Road.
29 May 2024
Assam Rfp For Construction Of Balance Work Of The 4-laning Of The Section From Jhanji To Demow Of Nh-37 (old): Pkg-ii: Road Works From Km 501+800 To Km 514+800 (13.000 Km), Under Sardp- Ne, Under Epc Mode In The State Of Assam.
17 May 2024