Arunachal Pradesh Tenders | Arunachal Pradesh PWD Tenders
Arunachal Pradesh government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Arunachal Pradesh Consultancy Services for Feasibility Study, Preparation of Detailed Roject Report(dpr) and Providing Preconstruction Services in Respect of Gelling-bishing Road (indicative Length 25.00 Km Including 01 No 250 Mtr Span Major Bridge) Green Field Alignment.
Estimated Cost :7914000
01 May 2024
Arunachal Pradesh Construction Of Road Fed Pol Depot At Pasighat, Arunachal Pradesh.
15 May 2024
Arunachal Pradesh Construction and Upgradation of Balance Work on Tato Menchuka Road (design Chainage From Km 33.100 to Km 41.175 (net Length 8.175 Km) and Existing Chainage From Km 36.000 to Km 45.100) to 2 Lane with Hard Shoulders Under Project Brahmank
Construction and Upgradation of Balance Work on Tato - M

Estimated Cost :541200000
04 May 2024
Arunachal Pradesh Construction and Upgradation of Balance Work on Tato Menchuka Road (design Chainage From Km 23.800 to Km 33.100 (net Length 9.300 Km) and Existing Chainage From Km 24.800 to Km 36.00) to 2 Lane with Hard Shoulders Under Project Brahmank in the Stat
Estimated Cost :790700000
04 May 2024
Arunachal Pradesh Special Repair to Bldg No. T-171 at Along, Special Repair to Bldg No. T-226 at Along, Provision of Interlocking Pathway with Galvalume Sheet Cover Near Bldg No. T-16 at Along, Provision of Certain Minor Works at Likabali, Sigar and Along Mil Stn Under Ge 872 Ews
Estimated Cost :2570000
30 Apr 2024
Arunachal Pradesh Construction of road from km 19.554 to km 34.700 (Package-1) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :2469478913
09 May 2024
Arunachal Pradesh Construction of road from km 43.65 to km 65.51 (Package-3) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh.
Estimated Cost :2830583680
09 May 2024
Arunachal Pradesh Construction of road from km 126.15 to km 168.00 (Package-6) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :5669168208
09 May 2024
Arunachal Pradesh Construction of road from km 65.51 to km 85.60 (Package-4) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :2491877476
09 May 2024
Arunachal Pradesh Construction of road from km 28.50 to km 55.725 (Package-2) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :4224870913
09 May 2024