Arunachal Pradesh Tenders | Arunachal Pradesh PWD Tenders
Arunachal Pradesh government tenders
- Consultancy Engineering


LOCATION SUMMARY DEADLINE
Arunachal Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Others; Cook, Manpower Outsourcing Services - Minimum Wage - Unskilled; Others; Sweeper, Manpower Outsourcing Services - Minimum Wage - Semi-skilled; Others; Washer, Manpower Outsourcing
Estimated Cost :1230747 INR
18 May 2024
Arunachal Pradesh Consultancy Services for Feasibility Study, Preparation of Detailed Roject Report(dpr) and Providing Preconstruction Services in Respect of Gelling-bishing Road (indicative Length 25.00 Km Including 01 No 250 Mtr Span Major Bridge) Green Field Alignment.
Estimated Cost :7914000
01 May 2024
Arunachal Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Others; Hiring Of 22 Nos Skilled Fitters With 4 Nos Additional Workers On As When Required Basis For Attending Routine Breakdown Work In Transmission Line Substation Associated With 132
Estimated Cost :26252784 INR
04 May 2024
Arunachal Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Admin; Data Entry Operator, Manpower Outsourcing Services - Minimum Wage - Semi-skilled; Others; Office Peon, Manpower Outsourcing Services - Minimum Wage - Skilled; Admin; Watch Ward, M
30 Apr 2024
Arunachal Pradesh Providing Of Manpower Outsourcing Services - Fixed Remuneration - Others; Senior Professional; Post Graduate Qty : 2
29 Apr 2024
Arunachal Pradesh Rfp For Of Major Bridge At Design Ch. 28+200 Of Hunli-anini Road (nh-313) In The State Of Arunachal Pradesh On Epc Mode Under Sardp
30 Apr 2024
Arunachal Pradesh Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :5127828009
09 May 2024
Arunachal Pradesh Construction of road from km 55.725 to km 113.250 (Package-3) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :8212804104
09 May 2024
Arunachal Pradesh Construction of road from km 65.51 to km 85.60 (Package-4) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :2491877476
09 May 2024
Arunachal Pradesh Construction of road from km 160.75 to km 209.90 (Package-5) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :8215526758
09 May 2024