Arunachal Pradesh Tenders | Arunachal Pradesh PWD Tenders
Arunachal Pradesh government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Arunachal Pradesh Consultancy Services for Feasibility Study, Preparation of Detailed Roject Report(dpr) and Providing Preconstruction Services in Respect of Gelling-bishing Road (indicative Length 25.00 Km Including 01 No 250 Mtr Span Major Bridge) Green Field Alignment.
Estimated Cost :7914000
01 May 2024
Arunachal Pradesh Construction Of Road Fed Pol Depot At Pasighat, Arunachal Pradesh.
15 May 2024
Arunachal Pradesh Special Repair to Bldg No. T-171 at Along, Special Repair to Bldg No. T-226 at Along, Provision of Interlocking Pathway with Galvalume Sheet Cover Near Bldg No. T-16 at Along, Provision of Certain Minor Works at Likabali, Sigar and Along Mil Stn Under Ge 872 Ews
Estimated Cost :2570000
30 Apr 2024
Arunachal Pradesh Construction and Upgradation of Balance Work on Tato Menchuka Road (design Chainage From Km 33.100 to Km 41.175 (net Length 8.175 Km) and Existing Chainage From Km 36.000 to Km 45.100) to 2 Lane with Hard Shoulders Under Project Brahmank
Construction and Upgradation of Balance Work on Tato - M

Estimated Cost :541200000
04 May 2024
Arunachal Pradesh Construction and Upgradation of Balance Work on Tato Menchuka Road (design Chainage From Km 23.800 to Km 33.100 (net Length 9.300 Km) and Existing Chainage From Km 24.800 to Km 36.00) to 2 Lane with Hard Shoulders Under Project Brahmank in the Stat
Estimated Cost :790700000
04 May 2024
Arunachal Pradesh Construction of road from km 55.725 to km 113.250 (Package-3) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :8212804104
09 May 2024
Arunachal Pradesh Construction of road from km 34.700 to km 70.000 (Package-2) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :5649513642
09 May 2024
Arunachal Pradesh Construction of road from km 0.00 to km 28.50 (Package-1) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Estimated Cost :4762222845
09 May 2024
Arunachal Pradesh Construction of road from km 0.00 to km 35.58 of Kharsang-Miao-Vijaynagar section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh.
Estimated Cost :1422217400
09 May 2024
Arunachal Pradesh Construction of road from km 113.25 to km 160.75 (Package-4) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh.
Estimated Cost :7909176231
09 May 2024