Andhra Pradesh Tenders | AP Online Tenders | AP BSNL Tenders
Andhra Pradesh government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Andhra Pradesh Protection To Track Near Major Bridge No: 543 And Approaches By Wire Rope Netting, Rock Fall Barriers Etc., Between Sxv-krpu Under Aden/krpu On Kk-i Line Of Wat Division.
Estimated Cost :24578554 INR
15 Oct 2024
Andhra Pradesh Providing The De-siltation Of Irrigation Main Canal From Anjaneya Swami Temple In Koilakuntla Road To Railway Over Bridge In Peddapasupula Road For Sanitation Purpose In Jammalamadugu Nagar Panchayat Under Dmf Grant 2024-25
Estimated Cost :243453 INR
25 Sep 2024
Andhra Pradesh Bza Division: Gdr- Bza, Bza - Ki, Bza - Bvrt& Gdv - Mtm Sections - Painting And Metallizing Of Bridges And Other Structures Including Trolley And Man Refuges, Ladders And Height Gauges In Sse/br/nlr, Sse/br/i/bza And Sse/br/ii/bza Sections Under Aden/br/s
Estimated Cost :17210259 INR
15 Oct 2024
Andhra Pradesh Guntakal Division - Ohe Modifications In Connection With Proposed Construction Of Rub No.512-a Of Size 2x5.0x4.5m(twin Box) Rcc Box In Lieu Of Lc No.120 At Km 260/11-13 Between Krishnapuram And Kadapa Stations By Box Pushing Method
Estimated Cost :4896702 INR
09 Oct 2024
Andhra Pradesh Scr Construction Organisation-nadikudi - Srikalahasti New Bg Line Project - Proposed Construction Of Left Over Works Of Important Bridge No.349 At Ch.250165.00m Across River Boggeru With Substructure For Double Line On Well Foundations And Super Structure
Estimated Cost :353736240 INR
07 Oct 2024
Andhra Pradesh Construction Of Causeway Across Jinkala Vanka On Road From Ambavaram To Koppolu Regadi In Ambavaram V&gp Of Vallur Mandal, Est.cost Rs.40.00 Lakhs
Estimated Cost :2988219 INR
27 Sep 2024
Andhra Pradesh Construction Of Rcc Bridge On Guntrakodu Panta Kaluva At Sagipadu In Unudurru Village Of Undi Mandal
Estimated Cost :1653836 INR
26 Sep 2024
Andhra Pradesh Construction Of High Level Bridge Across Krishna River Yetimoga - Yedurumundi Island, Krishna District
Estimated Cost :1037116388 INR
26 Sep 2024
Andhra Pradesh Construction Of High Level Bridge Across Krishna River - Yetimoga - Yedurumandi Island In Krishna District.
Estimated Cost :1090000000 INR
25 Sep 2024
Andhra Pradesh Balance Work Of Construction Of Proposed 4 Lane Rob And Its Approaches In Lieu Of Existing Level Crossing No.124e/spl3 At Km 1.800 On Nh 205 Between Prasannayapalle N Zangalapalle Railway Stations On Anantapur Dharmavaram Railway Section In The Stat
Estimated Cost :186800000 INR
28 Oct 2024