Andhra Pradesh Tenders | AP Online Tenders | AP BSNL Tenders
Andhra Pradesh government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Andhra Pradesh Repairing Of Roads Inside Plant Area At Kcc. (phase-iii).
01 Jun 2024
Andhra Pradesh Repair Maintenance To Storm Water Drains, Culverts, Drain Covers, Foot Paths, Hard Standing And Parking Tiles Etc At Area A At Naval Dockyard Visakhapatnam Under Ge(i) Dm Visakhapatnam
Estimated Cost :2421000 INR
31 May 2024
Andhra Pradesh Widening From Two Lane To 2 Lane With Paved Shoulders Of Link Road Between Nh40 And Nh440 From Km 0/000 To Km 1/532 Of Rayachoty Bypass In The State Of Andhra Pradesh Nh(o) For The Year 2023 24 On Epc Mode.
Estimated Cost :1314000
30 May 2024
Andhra Pradesh Rectification Of Damaged Earth Mat In 220kv And 132kv Switch Yards, Laying Of Water Lines To All Earth Pits And Metal Spreading To Improve The Earth Resistance At 220kv Sub Station Gudivada In District
Estimated Cost :9499230 INR
30 May 2024
Andhra Pradesh Sw-i ) "annual Zonal Contract - Alongside The Railway Track Yard From Krishna Bridge (i.e.,) Km.425/27-a For West Line And Km.425/27-a For East Line To Km.431/6&7 For Both Slow & Fast Lines Towards Visakhapatnam Side And Upto Km.569/0-1 Towards Secunderab
Estimated Cost :16478437 INR
30 May 2024
Andhra Pradesh Sw-i : Ryps- Concrete Road Of 300m X 6m Between Traverse 2 And Shops And Drainage Of 750 M X 2 M In Between Component Shop And Yard (bay 2,3 And 4). Sw-ii : Proposed Construction Of Shuttle Badminton Court In Railway Institute, Rayanapadu.
Estimated Cost :23746499 INR
30 May 2024
Andhra Pradesh Annual Zonal Contract - Satyanarayanapuram Railway Colony, Governorpet Railway Colony And All India Radio Colony Roads And Buildings In Sse/works/g.pet/bza & Sse/works/stpm Sections Under Aden/ Bldgs/bza Jurisdiction For The Period 1.7.2024 To 30.6.2025.
Estimated Cost :16100000 INR
30 May 2024
Andhra Pradesh Sw-i : Ryps-concrete Pathways Of 1872m X 2m In Yard And Reflooring Of Paint Shop (old) 37.5m X 60 M (bay 2, 3, And 4) Sw-ii : Rayanapadu : Extension Of Roof Over Water Testing Area Of Paint Shop Towards Bza End.
Estimated Cost :25472313 INR
30 May 2024
Andhra Pradesh Rectification Of Damaged Earth Mat In 220kv And 132kv Switch Yards, Laying Of Water Lines To All Earth Pits And Metal Spreading To Improve Earth Resistance At 220kv Sub Station Gudivada In District.
Estimated Cost :9499230 INR
30 May 2024
Andhra Pradesh Widening Of Chilakaluripet Nekarikallu Section Design Chainage 47.000 To 85.080 Of Nh 167a Package Ii To 4 Lane With Paved Shoulder Configuration In The State Of Andhra Pradesh Under Annual Plan 2022 23
Estimated Cost :4765500000
13 Jun 2024