Tenderskhoj
United Arab Emirates
- Water and Sanitation
LOCATION SUMMARY DEADLINE
United Arab Emirates Procurement Of Plant Maintenance
30 May 2024
United Arab Emirates Ds-316 Wastewater Treatment Plant In Hind City - Phase I Average Capacity 10,000 M3/day
24 Jun 2024
Iraq Provision Of Drilling Of Sa%di Pilot Horizontal Well
07 Jul 2024
United Arab Emirates To Carry Out Storm Water Ug Drainpipe Of Size 4", By Water Jetting Ofsuspended Debris From Storm Trench Inlet To 3nos Connecting S Tormmanholes To Sea Water Intake Forebay Exit At E-station Desal, Approx.length. Total 58 Meters Connected With 3 Pits
03 Jun 2024
United Arab Emirates 1: Trickling Filters Rehabilitation At Warsan Stp - 1 Lt
29 May 2024
United Arab Emirates Install And Operate Well Point Dewatering System Around Manholeincluding All Equipments, Submersible Pumps, Sump Pumps, Dischargepipes, Labour And Supervision, Generators, Etc., Complete And Dischargeas Directed By Engineers
29 May 2024
United Arab Emirates Lowering Groundwater Table At The Mainland (phase One)
30 May 2024
United Arab Emirates L-station Desal Required Fabrication, Supply And Installation Of Grphandrails For Replacing The Damaged Hand Rails Around Trash Pit Sin Lstation Sea Water Intake
29 May 2024
United Arab Emirates Design And Study For Automation System For Secondary Irrigation Networks In Abu Dhabi City, Mainland
06 Jun 2024
United Arab Emirates Ir-253/2 Landscape And Irrigation System For Airport Road From The Intersection Of Casablanca St. To The Interchange Of Sheikh Mohammad Bin Zayed Rd. - Phase 2
30 May 2024