Tenderskhoj
Poland
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
Poland Connection Of A Public Charging Station,
09 May 2024
Poland W - Execution Of Works; Kalisz Branch; Kepno, Reconstruction Of The Overhead Line 0.4kv Al 4x50mm - 10mb; Baranów, A Rural Commune; Mroczenie (village)
14 May 2024
Poland P - Execution Of Projects; Gdansk Branch; Kartuzy, Construction Of An Lv Cable Connection To Power A Residential Building On Plot 19/22 In Pepowo; Zukowo Rural Area; Pepowo (village),obi-2401877
02 May 2024
Poland P - Execution Of Projects; Kalisz Branch; Kepno, Preparation Of Documentation For The Construction Of A 0.4kv Cable Connection, Yakxs 4x240mm - 100mb, Supplying A Complex Of 6 2-unit Residential Buildings In A Terraced House; Syców City; Syców (town)
15 May 2024
Poland P - Execution Of Projects; Koszalin Branch; Koszalin Branch, Sarbinowo (village)
09 May 2024
Poland W + P - Execution Of Works + Documentation; Gdansk Branch; Wejherowo, Project Development: Construction Of A Cable Connection Powered From An Existing Pole To The P4 Integrated Cabinet Cable Switchgear Located On The Border Of The Plot According To The De
09 May 2024
Poland P - Execution Of Projects; Gdansk Branch; Kartuzy, Construction Of An Lv Cable Connection To Power A Garden Gazebo On Plot 231/5 In Wesiory Commune. Suleczyno; Suleczyno, A Rural Commune; Wesiory (village),obi-2401837
02 May 2024
Poland P - Execution Of Projects; Gdansk Branch; Kartuzy, Construction Of An Lv Cable Connection To Power A Single-family House On Plot 21/9 In Msciszewice, Commune. Suleczyno; Suleczyno, A Rural Commune; Msciszewice (village),obi-2401834
02 May 2024
Poland W + P - Execution Of Works + Preparation Of Documentation; Gdansk Branch; Wejherowo, Design Development: Weaving P2 According To Wp-p/24/015661;; Puck Is A Rural Commune; Lesniewo (village), 2401895
10 May 2024
Poland W + P - Execution Of Works + Documentation; Gdansk Branch; Wejherowo, Project Development: Cutting Into The Existing Yakxs 4x120 Cable And Installing The Cable Of The P2 Integrated Cabinet Switchgear Located On The Border Of The Plots According To The Des
10 May 2024