Tenderskhoj
Kyrgyzstan
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Kyrgyzstan Construction Of A Water Pipeline From Kuluk-dobo With Connection To The Existing System Of Kerben, Aksy District
Estimated Cost :5000000 KGS
12 Jun 2024
Kyrgyzstan Asphalt Concrete Pavement In Frunze Village, Komsomolskoye Village, Ozernoe Village
Estimated Cost :6829053 KGS
12 Jun 2024
Kyrgyzstan Landscaping Of The Territory Of The Administrative Building 2
Estimated Cost :829871 KGS
13 Jun 2024
Kyrgyzstan Asphalt Construction On Mendiev Street In Kyzyl-ata Village Opposite T. Baltagulov Village
Estimated Cost :4548066 KGS
12 Jun 2024
Kyrgyzstan Development Of A Sanitary Protection Zone Project
10 Jun 2024
Kyrgyzstan Asphalting Of E. Asanova And M. Saliev Streets In The Village Of Kyrgyz-chek In Mady Village, Kara-suu District, Osh Region.
Estimated Cost :7180850 KGS
13 Jun 2024
Kyrgyzstan Asphalt Construction Of Zhetigen Street In Ak-tam Village Opposite T. Baltagulov Rural Area
Estimated Cost :4942957 KGS
12 Jun 2024
Kyrgyzstan Construction Of A Water Pump System With The Construction Of A 0.4 Kw Power Line For Drinking And Irrigation Water Supply To The Residents Of The Ak-por Section Of The Yylkol Village Of The Ylay-talaa Rural Government.
Estimated Cost :1673850 KGS
21 Jun 2024
Kyrgyzstan Reconstruction Of The Nookat Sports Hall And Improvement Of Its Infrastructure Through The Construction Of A Basketball Court
Estimated Cost :6001980 KGS
13 Jun 2024
Kyrgyzstan Replacement Of Windows And Doors At Secondary School No. 6 Named After T. Umetaliev According To The Estimate (steam Grant)
Estimated Cost :3504341 KGS
12 Jun 2024