Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Construction Material, Cement, White Cement, Sand, Gravel Foot, Gravel, Brick Ballast, Bricks, Cc Interlocking Tiles, Office Furniture, Computer, Printer, Invertor, Cctv Camera, Almirah, Wall Tiles, Furs Tiles, Rod, Solar Light, Sanitary Items,
18 Jun 2024
Uttar Pradesh Supply Of Construction Material, Brick, Solar Light, Street Light, Tanker, Sand, Dala Gitti, Soling, Gitti, Interlocking Brick, Cement, Slab, Tin Shed, Sheet, Toilet Material, Pvc Pipe, Bolder, Rod, Stone Dust, Gsb, Hand Pump Material/rebore, Painting Mat
24 Jun 2024
Maharashtra Supply Of Solar Water Heating System As Per Is 12976:1990 (q3) Qty : 2
21 Jun 2024
Telangana Selection Of Channel Partner For Installation Of Grid Connected Solar Pv Project Under Pm Surya Ghar Muft Bijli Yojna In Districts Of Telangana Covered Under Tsnpdcl.
25 Jun 2024
Uttar Pradesh Supply Of Construction Material, Brick, Cement, Sand, Core Sand, Interlocking Tiles, Tiles, Rod, Rodi, Channel, Solar Light Items, Plastic Bank, Street Light Items, Hand Pump Repair/rebore, High Mask, Sign Board, E-rikshaw/cart, Dustbin, Library Items, Fu
20 Jun 2024
Uttar Pradesh Supply Of Construction Material, Furniture, Led Light, Handpump Rebore, Hume Pipe, Solar Light, Desktop, Computer, Laser Printer, Double Battery, Solar Panel, Cctv Camera, Furniture, Electronic Equipment, Brick, Cement, Murrum, Sand, Iron, Bajri, Tiles, P
14 Jun 2024
Uttar Pradesh Supply Of Construction Material, Interlocking Brick, Brick Gitty, Stone Gitty, Sob Brick, Cement, Sand, Rod, Wood/iron Door, Paint, Electric Material, Hume Pipe, Tiles, Gitty, Lime, Tree Guard, Highmast Light, Corona Kit, First Class Brick, Cement, Murrum
18 Jun 2024
Jharkhand Construction Of Rural Water Supply Scheme With Dc Solar Motor Pump Complete Set Etc All Complete Job For Pvtg Tola At Different Blocks Of Simdega Dist (group 05)
18 Jun 2024
Jharkhand Construction Of Rural Water Supply Scheme With Dc Solar Motor Pump Complete Set Etc All Complete Job For Pvtg Tola At Different Blocks Of Simdega Dist (group 02)
18 Jun 2024
Maharashtra Balance Of System Package Including Power Evacuation And Three (03) Years Comprehensive Operation & Maintenance For Cumulative Capacity Of 400 Mw (ac) (msedcl Phase-vii & Phase-ix) Solar Photovoltaic Power Project(s) At Four Different Locations In Maharas
27 Jun 2024