Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Odisha Part Design And Construction Of Elevated Viaduct And Six Elevated Stations (excluding Architectural Finishing ) From Chainage 15017.00m To 25987.78m And Including Ramp For Depot Entry Of Bhubaneswar Metro Phase-i Mrts.
Estimated Cost :8697100000
05 Jun 2024
Punjab Construction Of New Rcc Vr Bridge Of Jwc At Rd 197400 Near Village Gajjumajra Before The Flood Season Of 2024 To 25 To Save Nearby Road And Agricultural Land Before The Flood Season Of 2024 To 25
Estimated Cost :4000000
15 May 2024
Odisha Part Design And Construction Of Elevated Viaduct And Seven Elevated Stations (excluding Architectural Finishing ) From Chainage 7747.00 To 15017.00 Of Bhubaneswar Metro Phase-i Mrts.
Estimated Cost :6640600000
05 Jun 2024
Uttar Pradesh Vglj-cnb Section: Provision Of Limited Height Pedestrian Subway At Various Trespassing Locations. (2 No. Subway In Between Bhua-orai & 6 No. Subway In Between Ata-mls Section)
Estimated Cost :166249972 INR
03 Jun 2024
Rajasthan Earth Work In Bank/cutting Including Blanketing, Construction Of Minor Bridges, Rub/lhs, Fob, Trolley Refuges, Toe Wall, Retaining Wall, Pitching, Station Buildings And Other Structures, Platform, Platform Sheds, Staff Quarters And Other Ancillary Works F
Estimated Cost :2924763768 INR
14 Jun 2024
Jammu & Kashmir Stage Contract For Maintenance Of Roads And Bridges For The Year 2024-2025 Of Randb Division Uri (part-2nd) Election Urgent
Estimated Cost :1500000 INR
14 May 2024
West Bengal Schedule A- Provision Of New Fob (6 M Width) At Agradwip Under The Jurdisdiction Of Aen/kwae. Schedule B- Provision Of New Fob (6 M Width) At Dainhat Under The Jurdisdiction Of Aen/kwae.
Estimated Cost :2866698 INR
31 May 2024
Madhya Pradesh Construction Of 2 Lane Rob (over Track And Approaches) (1x60m+1x36m Span Bow String Girder)+(1x36m+2x30m+1x18m Span Composite Girder) Connecting Chhola Road To Coach Factory Road Via Nishatpura Yard Between Km 838/11-13 Of Bhopal-bina Section Of Divsion.
Estimated Cost :490946011 INR
30 May 2024
Uttar Pradesh Composite Steel Girder (procurement) Fabrication Erection Launching Including Proof Checking Of Designs By Iit On Pier Caps Complete Job On 04 Lane Rob. In Lieu Of Level X-ing No. 2spl. At Km 2/2-3 In Nakahajungle - Gorakhpur Rail Section At Harahwa.
Estimated Cost :36500000 INR
22 May 2024
India Balance Earthwork In Embankment & Cuttings, Ballast Supply, P-way Work, Construction Of Minor Bridges (including Rubs/lhs), Major Bridges (including Tadali Ror Flyover Main Span), Rail Under Road (rur) At Chandrapur Station By Box Pushing Method, And Rob
Estimated Cost :1429342853 INR
31 May 2024