Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
West Bengal Schedule A- Provision Of New Fob (6 M Width) At Agradwip Under The Jurdisdiction Of Aen/kwae. Schedule B- Provision Of New Fob (6 M Width) At Dainhat Under The Jurdisdiction Of Aen/kwae.
Estimated Cost :2866698 INR
31 May 2024
Madhya Pradesh Construction Of 2 Lane Rob (over Track And Approaches) (1x60m+1x36m Span Bow String Girder)+(1x36m+2x30m+1x18m Span Composite Girder) Connecting Chhola Road To Coach Factory Road Via Nishatpura Yard Between Km 838/11-13 Of Bhopal-bina Section Of Divsion.
Estimated Cost :490946011 INR
30 May 2024
Uttar Pradesh Composite Steel Girder (procurement) Fabrication Erection Launching Including Proof Checking Of Designs By Iit On Pier Caps Complete Job On 04 Lane Rob. In Lieu Of Level X-ing No. 2spl. At Km 2/2-3 In Nakahajungle - Gorakhpur Rail Section At Harahwa.
Estimated Cost :36500000 INR
22 May 2024
India Balance Earthwork In Embankment & Cuttings, Ballast Supply, P-way Work, Construction Of Minor Bridges (including Rubs/lhs), Major Bridges (including Tadali Ror Flyover Main Span), Rail Under Road (rur) At Chandrapur Station By Box Pushing Method, And Rob
Estimated Cost :1429342853 INR
31 May 2024
Bihar Rebuilding Of Bridge No.303(7x12.20m)g By (2x45.70m) Open Web Girder On Well Foundation And Permanent Diversion At Km 247/3-4 In Narkatiaganj-paniyahawa Section. (2) Rebuilding Of Bridge No. 329(4x12.20m)g By (2x30.50m) Open Web Girder On Well Foundation
Estimated Cost :256508965 INR
30 May 2024
Madhya Pradesh Sch. A:- Provision Of 3rd Supply At Wga-bau Ibh S&t Installations In Bsl Divn ; Sch. B:- Replacement Of Old Aged Panel And Signaling Gears Of Asirgarh Station On B-route On Bsl Division.; Sch. C:- Knw - Provision Of 2nd Entry Approach, Road, Bridge On Nal
Estimated Cost :3997044 INR
29 May 2024
West Bengal Provision Of Lhs/rub In Lue Of Manned L-xing No. Nn/126 (up & Dn) At Km 198/7-8 Between Gogh-croa Under Aden/east/apdj
Estimated Cost :51765497 INR
31 May 2024
Jharkhand Providing Humepipe Culverts At Different Locations In Mines Area Under Rajrappa Project
Estimated Cost :809795 INR
20 May 2024
Delhi Replacement Of Steel Girder 3x9.15m With Psc Slab On Bridge No.61(up& Dn) At Km:37/5-7 On Dee-re In The Section Of Sse/w/ggn Under Aden/dee (without Casting Of Psc Slab)
Estimated Cost :51655599 INR
31 May 2024
Maharashtra Integrated Infrastructure Development Of 60 M And 45 M Wide Roads, Construction Of Various Major And Minor Structures (viz. Flyover, Minor Bridges, Vups, Pups Etc.) And Allied Electrical Works (street Light) In Tps - 2 To Tps- 7 Under Naina Project.
Estimated Cost :23899459996
21 May 2024