Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Haryana Supply Of Dc Series Motor With 2 Point Starter, Dc Power Supply, Motor Generator Set Consisting Of Squirrel Cage Induction Motor 5 H P 400 Volt 3 Phase With Directly Coupled Compound Generator 3k W 250 Volt With Built In Panel Board, Manual Star Delta Sta
29 Apr 2024
Jharkhand Geo-technical Investigation Work For Setting Up Of Ground Mounted Solar Pv Projects Near Barhi, Dist. Jharkhand – Eq
27 May 2024
Jharkhand Inviting Expression Of Interest - Services For U#2 Overhauling Of Boiler Economizer & Back Pass At 525 X 2 Mw Thermal Power Plant.
10 May 2024
Maharashtra Procurement Of Non Torrefied Biomass Pellets On For Power Station Basis For Co-firing With Coal For Thermal Power Plant.
15 May 2024
Madhya Pradesh Supply, Installation, Testing And Commissioning Of Solar Pv Power Plant For Capacity 30 Kwp Ongrid System At Chiklod Kalan Building For Aiims Bhopal
Estimated Cost :2103573 INR
03 May 2024
Andhra Pradesh Design, Supply, Installation, Commissioning Maintenance Of Grid Connected Roof Top Solar Power Plant Service - As Per Tender; 1; Self-owned Qty : 1
Estimated Cost :5640000 INR
22 May 2024
Maharashtra Supply, Installation, Testing, Commissioning Of Solar Pv System Under Net Metering Scheme #1 Supply Of 20 Mva 33/11 Kv Ester Filled Transformer With Nifps For Mounte South Dss In Mumbai Distribution #1 Sitc Of 11 & 33 Kv Switchgears For Mounte South Dss I
06 May 2024
Maharashtra Supply, Installation, Testing, Commissioning Of Solar Pv System Under Net Metering Scheme A) Lot 1 – On Elevated Supporting Structure At Rooftop (location – Tata Power Parel Receiving Station), Lot – 2 At Rooftop Location Tata Power Chembur Receiving Stat
06 May 2024
Uttarakhand Supply Of Complete Structural Stores Of 01 X Fd Hybrid Solar Sys 30 Kva, Supply Of Complete Construction Material Of 01 X Fd Hybrid Solar Sys 30 Kva, Supply Of Complete Solar Panels Windmill Alongwith Battery Of 01 X Fd Hybrid Solar Sys 30 Kva, Supply Of
29 Apr 2024
Tamilnadu Construction Of New International Guest House Ground And First Floor At Nitttr Office Campus At Taramani 113 .#* Sub Work I- Building Portion Including Internal Water Supply Stationary Installations, Drainage And Development Works Sub Work-2 : Package C1:
Estimated Cost :3981313 INR
04 May 2024