Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Telangana Proposed Replacement Of Existing 3x12.20 Mts Steel Girders With 3x 12.2m Psc Slabs For The Bridge No. 152 At Km 101/7-8 Between Awm - Mugr Station.
Estimated Cost :15428119 INR
22 May 2024
Punjab Replacement Of Arch Bridge No.113 With Rcc Box On Asr-kemk Section & Replacement Of Girders With Rcc Slab Of Br. No. 23(up & Dn) Line & 28(siding) On Juc-asr Section.
Estimated Cost :12072836 INR
21 May 2024
Gujarat Construction Of Rub In Lieu Of Lc No.21 'c' Class Non- Interlocked At Km 873/2-3 Between Lalpur-jam - Gop-jam Stations. (2) Rajkot- Jetalsar Section - Construction Of Rub In Lieu Of Lc No. 21 'c' Non-interlocked At Km 21/4-5 Between Bhaktinagar- Ribda Sta
Estimated Cost :139194166 INR
21 May 2024
Uttar Pradesh Provision Of Additional One Span At Bridge No 80 In Km 6/3-4 Between Noh-szn Station Under Aden/pbe.
Estimated Cost :9508522 INR
20 May 2024
Gujarat Consultancy Services For Dpr For The Work Of Construction Of New Rob (road Over Bridge) Including Approaches & Service Road For Three Rob(s) Under Jurisdiction Of R&b Division In The State Of Gujarat.
14 May 2024
Maharashtra Proposed Construction Of Road Over Bridge In Lieu Of Level Crossing Gate (lc) No 93 (a) 88, 98 Between Lgatpuri – Manmad Section Of Central Railway (two Packet System).
Estimated Cost :873413783 INR
24 May 2024
West Bengal Supply Of 50 Ft Ts Ew Bailey Bridge With Steel Deckding (70r) (q3) Qty : 1
01 May 2024
India Balance Work For Construction Of Four Lane Rob Having Single Span 1x64.05m (bow String Steel Girder) C/c Of Pier And Balance Work Of Approach Of Already Pushed Limited Height Subway Along The Rob In Lieu Of L-xing No.61 At Km 99/23-25 Near Kohand Railway
Estimated Cost :158349963 INR
21 May 2024
Bihar Supplying , Fabrication And Erection Of Hoisting Bridge, Hoisting Arrangement And Approch Ladder In Sultanpur Ghat Link Channel Rd -17.00 Under Water Drainge Division.
Estimated Cost :1911252 INR
04 May 2024
Bihar Fabrication And Erection Of Gates, Embeaded, Hoisting Arrangement, Wellcover, Hoist Bridge At Fulwaria - 1.33km(r/s), Madhu Chhapra-8.94km(r/s), Jhikahiya -14.22 Km In Lalbekiya Right Embankment, & Goabari -2.34 Km In Marginal Bandh And General Maintaenan
Estimated Cost :1663433 INR
04 May 2024