Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Haryana Supply Of M7530486002 Solar Led Street Light: 25w+ Pole+ Battery Qty : 110
27 May 2024
Uttar Pradesh Invitation For Epc Package For Development Of 225mw Grid Connected Solar Pv Projects At Gsecl Solar Park (stage-iii).
31 May 2024
Jammu & Kashmir Supply Of Core Armoured Isi Mark, Mcb Db Spn Double Door Box Iron 8 Way With Isi Mark, Led Street Light Fitting 30 Watts 230 Volts, Angle Batten Holder With Isi Mark, Mcb 10 Amp Sp 240 Volts, Mcb Spn 100 Amp Dp With Isi Mark, Mcb Db Spn Box Iron 16 Way Wi
Estimated Cost :5200000 INR
18 May 2024
Rajasthan Repair And Maintenance Of Solar Power Plant Under Ge (a) Jaisalmer At Mil Stn
Estimated Cost :4800000 INR
06 Jun 2024
Madhya Pradesh Supply Of High Mast Lighting Octagonal Tower With Integrated All In One Solar Led Street Light (q3) Qty : 2
28 May 2024
Telangana Proposed Drilling Of Borewells For Drawing Access The Groundwater And Masonry Pedestal Around Borewell At Nrsc Shadnagar Campus.
Supply And Installation/replacement Of Cfl/ Ftl Light Fittings With Led Light Fittings At Nrsc Balanagar, Jeedimetla And

Estimated Cost :2130000 INR
29 May 2024
Assam Repair / Maintenance To Lt External Electrifications Repair / Maint Of Security Perimeter High Mast Lights/ Solar Lights/ Garden Lights And Connected Items And Repair/ Maintenance Of External Water Supply At Along Mil Stn Under Ge 872 Ews.
30 May 2024
Telangana Electrical Maintenance Department - Provision 1.782 Mw Of Solar Plants (rooftop) Of Different Capacities At Station Buildings , Service Buildings , Residential Buildings And Lc Gates Over Sc Division - Electrical Arrangements.
Estimated Cost :141696454 INR
05 Jun 2024
West Bengal Supply, Delivery Of Drag Bit With Tungsten Carbine Insert For Mud Rotary Drilling Method At Mmsd Store For Capf & Saf Accommodation Purpose
Repairing & Rectification Of Balibhasa Pry. School & Adjacent 3 Nos Use Solar Pwss By Supplying Required Mate

20 May 2024
Telangana Appointment Of Project Management Consultancy (pmc) Services For Establishing 67.5 Mw Solar Power Plant Under Stage-2 Through Open Enquiry.
05 Jun 2024