Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Jammu & Kashmir Supply Installation Testing Commission Solar Plant Of 200kw At Sitarganj, Sitc Solar Plant Of 400kw At Jammu, Sitc Solar Plant Of 150kw At Jind, Sitc Solar Plant Of 160kw At Gonda, Sitc Solar Plant Of 50kw At Unnao, Sitc Solar Plant Of 70kw At Champaran,
04 Jun 2024
Jharkhand Bids For State-wise Empanelment Of Agencies To Implement 2.017 Mw Of Grid-connected Rooftop Solar Power Projects Through Public - Private Partnerships And On A Design, Build, Finance, Operate, And Transfer Basis.
04 Jun 2024
India Engineering, Procurement, And Construction Package With Land For 300 Mw Of Interstate Transmission System Connected Solar Power Projects.
30 May 2024
Maharashtra Installation And Commissioning Of Solar Power Generating System For Club.
Structural Work, Fabrication, Erection Of Peb Shade Including All Civil Work.
Electrical Work, Complete Epc For 336 Kwp Roof Top Solar Power Generating System Complete W

26 May 2024
Kerala Disposal By Cutting And Removal Of Trees
Disposal By Cutting And Removal Of Trees, 617nos In Kseb Own Land At 220kv Substation, Mylatty, Kasaragod For The Installation Of Grid Tied 3.5mwp Ground Mounted Solar Plant Under Pmkusum Scheme Under Transmi

Estimated Cost :1741646 INR
21 May 2024
Maharashtra Supply Of 30kw Roof Top Solar Plant At Vashi,
24 May 2024
Rajasthan Supply Of 2.33 Mw Rooftop/cop , Solar Pv System, Implementation Of Rooftop/cop , Solar Pv System At Kota Division Of West Central Railway The Projects Are Located At Various Locations Of Kota Division Having An Aggregated Capacity Of 2.33 Mwp Through Publ
03 Jun 2024
India Supply Of 300 Mw Of Interstate Transmission System - Connected Solar Power Projects In Seven States.
30 May 2024
Kerala Division - Implementation Of Rooftop Solar Pv System Of Various Capacities At Various Locations Of Palakkad Division, Southern Railway (total Capacity - 300kwp) With The Objective Of Generating And Supplying Energy To Railway Installations Through Resco M
Estimated Cost :42701507 INR
04 Jun 2024
Delhi Hiring Of Consultants - Milestone/deliverable Based - Consultancy Services For Preparation Of Pfrs Dprs For Development Of Floating Solar Pv Projects On Various Dam Reservoirs In The State Of Meghalaya Mizoram Uttar Pradesh; Consultancy Serv Qty : 1
Estimated Cost :27230000 INR
03 Jun 2024