Tenderskhoj
India
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Uttar Pradesh New Construction Of Moh Nitganja To Harnaukha Link Road
Estimated Cost :37944000
21 May 2024
Assam Supply Of Railway Signalling Cable 12 Core X 1.5 Sq. Mm Etc. (detailed Description As Per Item Description)
Supply Of Pvc Insulated Armoured, Unscreened, Underground Railway Signalling Cable Copper Conductor Size 12 Core X 1.5 Sq.mm. Conforming To R

13 Jun 2024
Uttar Pradesh New Construction Of Barkhera Jaipal To Karaundhi Link Road
Estimated Cost :13778000
21 May 2024
Uttar Pradesh Design Build Operate Maintain And Transfer Multi Level Four Wheeler Parking At Shilpgram Tajganj Agra
06 Jun 2024
Haryana Operation And Maintenance Of Fatehabad To Khairika Section Of Nh10 (new Nh09) From Km 220.000 To Km 265.000 Total Length 45 Km In The State Of Haryana On Pbmc Mode
Estimated Cost :641300000
14 Jun 2024
Haryana Operation And Maintenance Of Hissar Fatehabad Section Of Nh10 (new Nh09) From Km 170.000 To Km 220.000 Total Length 50 Km In The State Of Haryana On Pbmc Mode
Estimated Cost :694600000
14 Jun 2024
Uttar Pradesh New Construction Of Audapur Mode To Hatipur Ganganagar Shamsherpur Gumta Link Road Via Madnapur
Estimated Cost :30747000
21 May 2024
Odisha Supply Of Roof Destination Board (frp) To Drg. No.f (c & W)-1557. Specification As Per Drg. Approx Weight Between 1 To 1.2kg/board. Golden Yellow In Colour. [ Warranty Period: 30 Months After The Date Of Delivery ]
13 Jun 2024
Haryana Supply Of Various Type Of Copper Crimping Sockets.
Heavy Duty Copper Crimping Socket Suitable For 70 Sq. Mm E-beam Cable, Stud Size: M-16 , Table-1, Item-18 As Per Rcf Specification No: Edts-200, Rev-nil, Am-2, Corr-1 & 2 Or Latest. [ Warranty Perio

30 May 2024
Bihar Formation Of Sub-base Course And Base Course Of Wbm For Fully Left Out
Formation Of Sub-base Course And Base Course Of Wbm For Fully Left Outroads And Drains Concreting At Mtps, Kanti

Estimated Cost :38521424 INR
05 Jun 2024