Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Andhra Pradesh Supply Of Centre Pivot Pin For Coaches To Drg.no.t-0-6-602, Alt.b/14. As Per Drg.no. Drg.no.t-0-6-602, Alt.b/14 Spec: As Per Drawing.
Centre Pivot Pin For Coaches To Drg.no.t-0-6-602, Alt.b/14. As Per Drg.no. Drg.no.t-0-6-602, Alt.b/14 Spec: As Per

06 Jun 2024
Uttar Pradesh Empanelment Of Local Chemist/ Druggist For Supply Of Local Purchase Of Non-rate Contract Of Cssd (sterilization) Consumables.
30 May 2024
Tamilnadu Supply Of Emergency Openable Window Frame For Non-ac Coaches Items 5 To 11 Of Icf/std-5-4-005 Alt.n/nil Col.iii. [ Warranty Period: 30 Months After The Date Of Delivery ]
11 Jun 2024
Uttar Pradesh Empanelment Of Local Chemist/ Druggist For Supply Of Local Purchase Of Non-rate Contract Of Surgical Consumables.
30 May 2024
Uttar Pradesh Supply Of Water Tank (450 Ltr) Complete Without Upper Frame For Lhb Power Car & Lhb Dd Coaches, As Per Drg. No. Lp63138 Alt-c , Packing Instruction - Pi100 [ Warranty Period: 84 Months After The Date Of Delivery ]
19 Jun 2024
Andhra Pradesh Supply Of Leader Nut Casing For Slack Adjuster Comforming To Rdso Spec.no.07-abr-1992 Amendment No.4 Of July.2000 To Rdso Drg.no.wd- 82064-s 07rc, Item-1 Alt.6.
Leader Nut Casing For Slack Adjuster Comforming To Rdso Spec.no.07-abr-1992 Amendment No

05 Jun 2024
West Bengal Supply Of Brake Cylinder
Brake Cylinder 300 Mm Complete For Air Brake On Freight Stock To Rdso's Drg. No. Wd-92051-s-11, Alt. No. 3, Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]

05 Jun 2024
Jharkhand Supply Of Overhauling Kit For Wdg4/wdp4 Locomotive Engine Governor (consisting Of 49 Items) Details Woodward Part No As Per Annexure. Spec: Dlw Part No-16340061. [ Warranty Period: 30 Months After The Date Of Delivery ]
13 Jun 2024
Maharashtra Consultancy Services For Authority’s Engineer For Construction Of Access Controlled Pune Ring Road In The State Of Maharashtra On Epc Mode For Package Prr - W1 From Urse Km (-) 0+650 To Village Kemsewadi Km 14+000 In Tq. Maval/mulshi (length – 14.65 Km).
27 May 2024
Uttar Pradesh Supply Of End Wall Construction Assembly
End Wall Construction Assembly Complete Alongwith Shutter Complete/lock Assembly To Drawing Number 2 10113.0.76.300.012r1 & Lw44318 Alt. C & Mdts 21332 Ver.01 To Drawing Number: Lg15195 Alt. 'd', Packing Inst

14 Jun 2024