Tenderskhoj
India
- Industry Minerals and Metals
LOCATION SUMMARY DEADLINE
Bihar Supply Of 197 Mt Reinforcement Steel For 4x210 Mw Ntpc R And M Site, Bihar. .
20 May 2024
Karnataka Supply Of Materials For Transducer Assembly As Per Iti Specification
Filter, Label Transducer, Membrane-glottine , Membrane- Bolting , Ring , Membrane Silk Cloth, Ring Magnet , Cover, Coil Transducer

Estimated Cost :464400 INR
30 May 2024
Assam Procurement Of Interior Works For Light Gauge Steel Frame Structure (lgsf) At Assam Water Centre
Estimated Cost :15000000
17 May 2024
Bihar Supply Of 1050 Mt Reinforcement Steel For Fgd Package Of Ntpc Stps Stage I And Ii (4x210 Mw Plus 3x500 Mw), Bihar
20 May 2024
Telangana Supply Of Fr.6 Transition Piece Assy Coating
16 May 2024
Telangana Supply Of Hepa84897001: Ss Welded Tube 5/8" X1 24, L-4000 Qty : 3492
20 May 2024
-Street-Elbow-3/4-"-Bsp(f)-X-3/4-"-Bspt(m)-As-Per-Drg-No:icf/std-3-5-129-Item-2-[-Warranty-Period:-48-Months-After-The-Date-Of-Delivery-]"> Karnataka -Street-Elbow-3/4-"-Bsp(f)-X-3/4-"-Bspt(m)-As-Per-Drg-No:icf/std-3-5-129-Item-2-[-Warranty-Period:-48-Months-After-The-Date-Of-Delivery-]">Supply Of Street Elbow 3/4 " Bsp(f) X 3/4 " Bspt(m) As Per Drg No:icf/std-3-5-129 Item-2
Street Elbow 3/4 " Bsp(f) X 3/4 " Bspt(m) As Per Drg No:icf/std-3-5-129 Item-2 [ Warranty Period: 48 Months After The Date Of Delivery ]

-Street-Elbow-3/4-"-Bsp(f)-X-3/4-"-Bspt(m)-As-Per-Drg-No:icf/std-3-5-129-Item-2-[-Warranty-Period:-48-Months-After-The-Date-Of-Delivery-]">13 May 2024
Tamilnadu Supply Of Gasket Remover Paint Stripper (q2)
Qty : 12

20 May 2024
Andhra Pradesh Supply Of Split Air Conditioner (ceiling Mount Type), As Per Is: 1391 (part 2) (q2), Split Air Conditioner Including Green Ac, Wall Mount Type (q2), Extra Refrigerant Pipe For Air Conditioners (accessories) (q4), Drain Pipe For Air Conditioners (accessori
20 May 2024
India Supply Of Manufcaturing Of Ss Lot Assly And Ss Oht Assly
20 May 2024