Tenderskhoj
India
- Consultancy HR
LOCATION SUMMARY DEADLINE
Gujarat Civil Works Including All Consumable Material, Tools & Tackles, Plant & Machineries, Equipment, Manpower, Etc. In Connection With Combined Station Works Of Mechanical, Civil, Electrical & Instrumentation Works And Other Facilities Under Kandla Gorakhpur L
28 May 2024
Haryana Iqbalpur , Jhanjrola , Kaliawas , Khera , Mubarikpur , Dhani Mirchi Ki , Sultanpur , Group Of 9 No 1 Ci Valves / C I D/f Sluice Valves 100 Mm New Sluice Valve / Providing & Fixing Of 100mm Sluice Valve With Operating Key Complete With Tail Piece, Cid
Estimated Cost :19900 INR
21 May 2024
Haryana Fabrication Of Aluminium Frame 18 Gauge -powder Coated Lvory Color With Laminated Board 12 Mm Including Bolts, Handles, Aldrop Etc Complete Work, Providing Fixing Of Calcium Silicate Board 595 Mm X 595mm False Ceiling In Pre- Coated Angle Metal Grid Fixed
Estimated Cost :500000 INR
22 May 2024
Haryana Kalali Block: Siwani Panchayat: Kalali Dist.: Annual Mtc. Work For Water Supply 1 Ci Valves / C I D/f Sluice Valves Repair Of 150mm Sluice Valve Including Making M.s Spendle, G.m. Chuck Nut, New Chimta, Nut Bolt, Rubber Jain, Glain Dori, Grease Sluice Val
Estimated Cost :9060 INR
24 May 2024
Rajasthan Supply Of Tractor Traolly, Empty Cement Bags, Jcb, And Inspection Vehicle With Driver And Other During Rainy Season In Sub Division Sarwar Year 2024-25
Estimated Cost :245000 INR
28 May 2024
Delhi Conservation Of Water Bodies.
Bio-remediation And Cleaning Including Removal Of Floating Plants, Materials Etc. Of Bhalswa Lake At Bhalswa (specialized Work).

Estimated Cost :12007004 INR
28 May 2024
Haryana Rough Cost Estimate For Running, Automation, Operation, Repair And Maintenance Of Water Supply Tube Well For Outsourcing In New Added Village In Mcf Of Prithla Consistency Faridabad For One Year Period.
Estimated Cost :3093552 INR
27 May 2024
Haryana Rough Cost Estimate For Running, Automation, Operation, Repair And Maintenance Of Water Supply Tube Well For Outsourcing In New Added Village In Mcf Of Tigaon Consistency Faridabad For One Year Period.
Estimated Cost :3749760 INR
27 May 2024
Delhi Day To Day Operation Of Pumps At Staff Qtrs. Sector-6 R.k. Puram, New Delhi
Estimated Cost :198000 INR
27 May 2024
Uttar Pradesh Hiring Of Diesel Vehicle With Driver. #hindi Image
01 Jun 2024