Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Uttarakhand Rfp For The Work Of Construction Of Tunnel/cavity Car Parking At Kempty Fall Mussoorie On Nh-707a (mussoorie To Chakrata) Under District Tehri Garhwal In The State Of Uttarakhand On Epc Mode
04 Jun 2024
India Construction Of One Rub Of Internal Size 4.00mx2.50m Between Km 221/2-4 In Bllimora-amalsad Section And Construction Of Another Rub Of Internal Size 4.00mx2.50m Between Km 223/0-2 In Amalsad -vedchha Section.
Estimated Cost :77599726 INR
11 Jun 2024
India Rfp For Appointment Of Safety Consultant For Construction, Operation & Maintenance Of Z-morh Tunnel Including Approaches On Srinagar Sonamarg Section Connecting National Highway No. 1 In The Ut Of J&k On Dbfot Annuity Basis
24 May 2024
Karnataka Replacement Of Steel Girder For Bridge No. 422 At Km 0/800-900 (b-line And Shunting Neck) Between Bengaluru (sbc) - Yesvanthpur (ypr) Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
Estimated Cost :26117051 INR
06 Jun 2024
Karnataka Proposed Construction Of Rcc Drain In Connection With The Work Of "through Ballast Recoupment Of Points And Crossings - 6 Points In Dodbele (dbl) Yard And 4 Points In Hirehalli (hhl) Yard (total 10 Nos., )". Sw Ii : Bengaluru - Sampige Road Sec : Construc
Estimated Cost :27325081 INR
06 Jun 2024
Odisha Execution Of Zonal Works (for Bridge Repair Works) In Dungripali (in) - Deogaon Road (in) Section And Balangir(ex) - Sonepur(in) Section For The Period Ending 30.06.2025 Under Aden/balangir.
Estimated Cost :7425367 INR
06 Jun 2024
Odisha Execution Of Zonal Works (for Bridge Repair Works) In Sarla(ex) - Dungripali (ex) Section For The Period Ending 30.06.2025 Under Aden/bargarh.
Estimated Cost :8788486 INR
06 Jun 2024
Andaman and Nicobar Islands (UT) Improvement To Waterway Bridges Like Pitching, Flooring, Retaining Wall Etc, In Aden/gdg Section.(maintenance Period:03 Months)
Estimated Cost :19728270 INR
07 Jun 2024
India Improvement To Waterway Bridges Like Pitching, Flooring, Retaining Wall Etc, .in Aden/bay Section. (maintenance Period 03 Months)
Estimated Cost :22476426 INR
07 Jun 2024
Karnataka Repairs To Drains And Culverts At 58su Af Station Chimney Hills.
Estimated Cost :750000 INR
31 May 2024