Tenderskhoj
India
- Industry Fire Safety and Security
LOCATION SUMMARY DEADLINE
Rajasthan Purchase Of Accessories, Consumables Of Monitors And Ventilators, Make Wipro Ge Healthcare On Proprietary Basis, Dura-cuf, Adult, Dinaclick, 23 - 33 Cm, 5/ Box, Assy Care Hose Adult/ped 2t Dinaclick 3.6m 80369-5, Nibp Neonatal Hose Luer Conn 3.6m, Ecg Tru
14 Jun 2024
Andhra Pradesh Supply Of Caustic Soda, Material-solid Form (flakes)to Is:252-2013. Packing In 50 Kgs Hdpe Bags.
Caustic Soda, Material-solid Form (flakes)to Is:252-2013. Packing In 50 Kgs Hdpe Bags. [ Warranty Period: 30 Months After The Date Of Delivery ]

25 Jun 2024
Chhattisgarh Supply Of Safety Shoes For Ntpc Stations.
24 Jun 2024
Bihar Supply Of Fire Retardant Low Tension Cotton
Fire Retardant Low Tension Cotton Insulation Tape For Electrical Purpose In Rolling Stock Conforming To Icf Specification No. Icf/elec/921 (rev-0) With Cs-1,2,3 & 4 With East Central Railway Monogram Print

05 Jun 2024
Rajasthan Transport Work Of Books.
Estimated Cost :200000 INR
31 May 2024
West Bengal Supply Of Solenoid Valve, Push Botton Valve, Pilot Valve, Valve, Air Filter, Pipe, Pvc Cover Pipe, Pvc Pipe Brake Pipe, Elbow Connector, Straight Connector, Union Connector, Male Elbow Connector, Male Straight Connector, Soak Mat, Cotton Waste, Wind Socks
Estimated Cost :525000 INR
07 Jun 2024
West Bengal Supply Of Spares For Elgi Air Compressor, Gasket, Free End, Brush, Dia 20 Gudgeon Pin, Needle Roller Bearing, Bearing, Ball Single Row, Gasket, Fly End, Oil Seal B45 X 60 X 12.5, Ring, Slotted, Oil Control Dia 100|, Ring, Stepped Compression, Dia 100|, Ri
11 Jun 2024
Rajasthan Supply Of Ball Point Pens As Per Is 3705 (q4), Pencil Box (q4), School Bags (v2) (q3) Qty : 580
05 Jun 2024
West Bengal Supply Of Cable Assy Throttle Control, 40-302657 Cable Parking Brake, 20-902901 Kit Seal Main Hyd Pump, 320-a7088 Element Fuel Sidemento, 44 681 01 0 00 Alternator Assy 12v 65a, 40-302376 Filter Assy, 40-300893 Hyd Filter, 550-42394 Kit Spider, 25-220998
17 Jun 2024
Karnataka Supply, Transportation And Installation Of Porta Cabin.
31 May 2024