Tenderskhoj
India
- Industry Fire Safety and Security
LOCATION SUMMARY DEADLINE
Punjab Supply Of Gas Based Suppression System Seamless Cylinders, Supply Of Fluoro Ketone Gas, Centralized Master Cylinder Kit, Centralized Slave Cylinder Kit Comprising, Centralized Tertiary Cylinder Kit Comprising Tertiary, Supplying Installation Of Central Fo
17 May 2024
Delhi Supply Of Maintenance Repair Kit For Direct Brake Assembly (manifold) As Per Ftrtipl Part No. 790 006 155consisting Of 02 Items (i) Seal, Ftrtipl Part No. 0097025 00, Qty. 1 No. (ii) O-ring, Ftrtipl Part No. 0187045 00a, Qty. 5 Nos. [ Warranty Period: 30
08 Jul 2024
Rajasthan Supply Of 154-27-11310 Gear First, 154-27-11260 Cage Bearing, 060-43-02319 Bearing Roller, 154-27-11250 Pinion First, 154-27-12310 Shaft Sprocket, 154-27-12110 Gear Final Drive, 154-27-12120 Hub Sprocket, 31z2140156 Liner Cylinder, 30z2160311 Seal Service
27 May 2024
Manipur Supply Of Clutch Plate, Pressure Plate, Air Filter, Fuel Filter, Oil Filter, Clutch Cable, Acclerator Cable, Brake Shoe Front And Rear, Gear Lever Repair Kit, 1 Point 2 Volt Rechargeble Battery, Gasket Set, Rocker Gasket Cover For Gen Set 10 Kva, Stwds, R
Estimated Cost :100000 INR
28 May 2024
West Bengal Supply Of Laundry Bag (q3)
Qty : 36500

13 May 2024
Andhra Pradesh Supply Of Fire Hose 63mm X15 M, Hydrant Caps With Chains, Hydrant Cup Washers, Dummy Washers Small, Dummy Washers Big, Gasket Sheet - Champion, 0 5 Inch Nrvs, Pressure Gauge Glycerin 0 -10, Pressure Gauge Glycerin 0 -16, Quartzoid Bulbs, Sprinklers, Wind
16 May 2024
Rajasthan Supply Of Oil Seal, Hose Radiator, Wiper Blades, Arm Windshield Wiper, Relay. Qty : 346
09 May 2024
Jharkhand Supply Of Safety Helmet Fitted With Led Head Lamp
Safety Helmet Fitted With Led Head Lamp (technical Specification As Per Annexure - 1 Attached) [warranty Period: 30 Months After The Date Of Delivery ]

27 May 2024
Karnataka Supply Of F22 Raptor By Bill Sweetman As Per Si No 1 Of Annexure, F35 Lighting Ii Iiiusrated By Lou Drendel As Per Si No 2 Of Annexure, Joint Strike Fighter Design Development Of International Aircraft Per Si No 3 Of Annexure, High Speed Wind Tunnel Testi
28 May 2024
Odisha Supply Of Transmitter, Vibration, 230vac, Emt800 (q3), Sensor, Piezo Accelerometer, 100mv/g (q3), Cable, F/sensor, Model: Em1001, 220deg C (q3) Qty : 20
16 May 2024