Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Roof Top On Grid Solar Plant At Igp, Ceti Hostel Thk, G+5 Building Pnvl And Thane Running Room.
24 May 2024
Maharashtra Proposal For Setting Up Roof Top Solar Power Generation System At Vip Rest House And Prakash Parv 400kv Control Room Buildings At 400kv Rs(o&m)dn, Padghe Under Hvdc Rs(o&m)circle.
01 May 2024
Assam Provision Of 490 Kwp Grid Connected Rooftop Solar Power Plant At Rny Station Pp Shed Under Sse/elect/rny Including 5 Years Amc/camc.
Estimated Cost :24500000 INR
17 May 2024
Haryana Supply Of Total Quoted Value Including Gst For Sitc Of Solar Power Plants Grid Connected 78 Kwp At Rt Loni (q3), Total Quoted Value Including Gst For Sitc Of Solar Power Plants Grid Connected 29 Kwp At Rt Piyala (q3) Qty : 2
16 May 2024
Odisha Supply Of Off - Grid Solar Photovoltaic (pv) Power Plant (q3) Qty : 5
16 May 2024
Maharashtra Design, Manufacture, Supply, Installation, Testing, Commissioning With Remote Monitoring System 160 Kw Capacity Grid Connected Solar Pv Power Plant Ground Mounted Net Metering System At Water Treatment Plant Dhoki, Tq. Dist. For Dhoki And 4
Estimated Cost :10193751 INR
01 May 2024
Assam Selection Of Project Implementation Agency (pia) / Consortium Partner For Sitc Of 50 Kw Solar Car Port At Hvdc Biswanath Chariali Ss And Grid Connected 170 Kw Rooftop Solar Pv Power Plant In 400/132 Kv Silchar Substation
Estimated Cost :13300000 INR
06 May 2024
Maharashtra Harnessing Of Solar Energy On Rooftop Of Buildings By Provisioning Of 1mwp Solar Rooftop Power Plant Under The Public Private Partnership(ppp) Model In Matunga Workshop.
08 May 2024
Bihar Procurement Of Power Through Tariff-based Competitive Bidding From Grid-connected 10 Mw (ac) Floating Solar Pv Power Project To Be Set Up Under Resco Mode Over Reservoir Of Durgawati Dam Located At Kaimur/rohtas District In The State Of Bihar.
10 May 2024
Bihar Empanelment Of Agencies For Design, Supply, Erection, Testing & Commissioning Including Warranty, Comprehensive Operation & Maintenance (five Years) Of Grid- Connected Rooftop Solar Power Plants Of Various Capacity Under Capex Model For An Estimated Capac
27 May 2024