Tenderskhoj
India
- Industry Machinery
LOCATION SUMMARY DEADLINE
Meghalaya Supply Of Assy Turbocharger, Assy Slave Cylinder, Front Wind Shield, Oil Seal Axle Shaft, Oil Seal Front Hub. Qty : 5
07 Jun 2024
Maharashtra Supply Of Pin Fuel Cum Roller
Pin Fuel Cum Roller To Drg. No.tpe-16-0053 [ Warranty Period: 30 Months After The Date Ofdelivery ]

01 Jun 2024
Maharashtra Supply Of Main Disel Engine Along With Propulsion Integration
Design, Manufacture, Supply And Commissioning Of Main Disel Engine Along With Propulsion Integration

14 Jun 2024
Gujarat Supply Of 110v Dc Motor
110v Dc Motor For Electric Point Machine (irs Type) With Gear Box With 400v Ac Immunity With Ip 67 Protection (ip 67 Compliant) As Per Specification No: Irs:s 37-2022 Ver.2.0 Or Latest, Details As Per Annexure-a Attached. Mat

27 May 2024
Jammu & Kashmir Supply Of Green Fodder (q3)
Qty : 20641

20 May 2024
Karnataka Supply Of O Ring For 7 Gpm Fuel Pump Size: Od - 90mm X Id - 82mm X 4mm Thick As Per Drawing No :- Emd/ubl/rt/1223-2 [ Warranty Period: 30 Months After The Date Of Delivery ]
23 May 2024
Maharashtra Design Supply Installation Testing Commissioning And Allied Activities For 5 Kld Stp At Various Locations 07 Nos Under Gujarat State Office
Estimated Cost :19832406 INR
30 May 2024
Tamilnadu Supply Of Hand Operated Grease Pump
Hand Operated Grease Pump With 5 Kg Bucket Capacity, 2.2 Mtrs. Grease Hose, Hand Gun And All Std. Fittings. Make: Elgi/ Groz/ Penta [ Warranty Period: 30 Months After The Date Of Delivery ]

21 May 2024
West Bengal Supply Of Modified Coach Watering Inlet( Connector) With Strainer To Drawing No- Camtech. M. Coach 08.3material And Specification No. Cw-08-02. [ Warranty Period: 30 Months After The Date Of Delivery ]
28 May 2024
West Bengal Supply Of Kbi Make Overhauling Kit For Distributor Valve And Pressure Converter Consisting Of 02 (two) Setsas Per Annexure - A. 01(one) Set For 57 Items And Annexure- B. 01(one) Set For 21 Items Attached. [ Warranty Period: 30 Months After The Date Of Del
24 May 2024