Tenderskhoj
India
- Transportation Airports & Aviation
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Reward Management (q3)
Reward Points (petromiles/retailer Loyalty Points/ Or Any Other Schemes., Etc). Qty : 1

17 May 2024
Odisha Supply Of Cdr Analysis (q3)
Qty : 10

17 May 2024
Tamilnadu Supply Of Part No - 97070 Part Description - Cleaning Compressor Or Turbine, Ea- Kit, Part No - 97076 Part Description - Inspection Bearing, Ea- Kit, Part No - 97081 Part Description - Radial-bearing Change, Ea- Kit, Part No - 97084 Part Description - Axi
06 May 2024
West Bengal Supply Of One Set Of Spare Parts
Supply Of One Set Of Spare Parts Of Air Compressors, Make- Atlas Copco, Model- Ga 75+, As Per Annexure Attached. [ Warranty Period: 12 Months After The Date Of Delivery ]

30 Apr 2024
Uttarakhand Supply Of Air Compressor.
10 May 2024
Gujarat Supply Of H Held Terminal (q3), Development Maintenance Of Device Application (q3), Development Maintenance Of Central Server Application (q3), Development Maintenance Of Depot Application (q3), Connectivity Charges (q3) Qty : 55000
31 May 2024
West Bengal Supply Of Light Weight Push Trolley
Light Weight Push Trolley [ Warranty Period: 12 Months After The Date Of Delivery ]

06 May 2024
Maharashtra Engine Service Desk Plus Enterprise Edition (q3), Manage Engine Endpoint Central Enterprise Edition (q3) Qty : 4000
17 May 2024
Maharashtra Supply Of Tool Trolley With Six Drawer As Per Attached Specification Annexure-a And Drawing
Supply Of Tool Trolley With Six Drawer As Per Attached Specification Annexure-a And Drawing. [ Warranty Period: 12 Months After The Date Of Delivery ]

14 May 2024
Himachal Pradesh Supply Of Atl Consumable Items (q3) Arduino Nam Saldered Pin, Arduino Mega , Rtc Module, Lcd Module With 126, Joystick, 4 X 4 Keypad, Hco5, Servo Motor, Bo Motor, Robotics Car Kit, Drone Controller, Drone Battery, Drone Battery Change, Drone Frame, Drone
17 May 2024