Tenderskhoj
India
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
Uttar Pradesh Work Of Replacing The Damage 33 Kv Vcb And Control Pannal Installed At 33 11 Kv Substation Under B.p 2024-25 Under Edd Ii Shahganj Machhalishahar
06 May 2024
Uttar Pradesh Centrifuging Of Transformer Oil Of 20 Mva T/f At 400 Kv S/s Kasara-mau.
Estimated Cost :41250 INR
07 May 2024
Uttar Pradesh Various Electrical Work- Changing Ab And Xlpe Cable, Installation Of Ht And Lt Fuse Set, Installation Of Vcb Under Additional Business Plan 2024-25 In Edd Deoria, Gauribazar And Sallempur
Estimated Cost :2838000 INR
07 May 2024
Uttar Pradesh Mechanical And Allied Civil And Structural Works For Augmentation Of Hp Steam Header From Msqu To Sru.
15 May 2024
Uttar Pradesh Various 33/11 Kv Substation Install- Ation 33 Kv Vcb, 11 Kv Vcb Other Material Replace And Repair Maintenance Work In Business Plan 2024-25
Estimated Cost :798146 INR
09 May 2024
Maharashtra Supply Of Line Interactive Ups With Avr (v2) (q2)
Qty : 30

13 May 2024
Uttar Pradesh Supply Of Single Core Elastomeric Cable Size 240 Sq Mm, 1500 Volts As Per Rdso Specification No. E/14/01 (rev.2) 1993 Part Ii.
Single Core Elastomeric Cable Size 240 Sq Mm, 1500 Volts As Per Rdso Specification No. E/14/01 (rev.2) 1993 Part Ii. [ War

03 Jun 2024
Uttar Pradesh Repair Of Extension Unit Studer Audio Console, Online Testing Studer Audio Console, Online Configuration Studer Audio Console, Online Installation Studer Audio Console, Freight Charges - Repair Of Extension Unit Of Studer Make Oa1500 Switching Console Qty
Estimated Cost :300000 INR
23 May 2024
Uttar Pradesh Mechanical Works Including Allied Civil And Structural Works For Various Process Schemes At Mathura Refinery
Estimated Cost :11302430 INR
15 May 2024
Jharkhand Supply Of Xlpe Insulated Pvc Sheathed Armoured Ug
Supply Of Xlpe Insulated Pvc Sheathed Armoured Ug Circular Al Cable Of 4 Core 50 Sq.mm Of 1100 V Grade. [ Warranty Period: 30 Months After The Date Of Delivery ]

10 May 2024