Tenderskhoj
India
- Industry Machinery
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Overhauling Kit For Vent Valve (kbil-773336) Of Knorr-bremse Make Ccb System For Wap-7/wag-9 Locomotives.
Overhauling Kit For Vent Valve (kbil-773336) Of Knorr-bremse Make Ccb System For Wap-7/wag-9 Locomotives. [ Warranty Period: 30 Month

14 May 2024
Uttar Pradesh Supply Of Automated Bacterial Identification Susceptibility Testing System (q3)
Qty : 1

11 May 2024
Rajasthan Welcome Maintenance And Miscellaneous Repair To Plaster, Flooring Sanitary Fittings, Sunkun Treatment, Joinery Etc In Md Accommodation Under Age B/r-i At Ge Nasirabad.
23 May 2024
Andhra Pradesh Supply Of C2w Relay Air Valve Rubber Part Kit Consists Of 9 Items As Per Annexure Attached.
C2w Relay Air Valve Rubber Part Kit Consists Of 9 Items As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]

28 May 2024
Gujarat Supply Of Kit For Lsd (escort Make ) For Blc Wagon Consisting Of 04 Items. (i) K Ring, Drg. No. 4kb 4861/1=01 No (ii) K Ring, Drg. No. 4kb 4861/2 = 01no (iii) O Ring, Drg. No. 4 A 43411 = 01 No. (iv) Filter, Drg. No. 4a 70725 = 01 No. & Other Technical Re
03 Jun 2024
Uttar Pradesh Supply Of Set Of Miscellanous Pneumatic Rubber Components For 8 Valves For Ac Locomotive As Per Annexure A .
Set Of Miscellanous Pneumatic Rubber Components For 8 Valves For Ac Locomotive As Per Annexure A . Each Set Comprising 26 Items, 55 Nos Pl:2

16 May 2024
Rajasthan Supply Of Gasket, Cover Panel, Gear Pump, Pcb Bus, Screw, Metric, Slotted, Ch Hd Coarse Pi Tch Precision M3x10 Is : 1366 Brass, Plate Metal, Lens Optical Instrument. Qty : 133
23 May 2024
Punjab Supply, Installation And Commissioning Of Additional Pipeline Complete With Spray Nozzle Assembly And Associated Fittings In 03 Nos. Shower Testing Rigs As Per Specification No. Mech/mh/ig/st/03/fin Dtd. 18/03/2024. [ Warranty Period: 30 Months After The
13 May 2024
Tamilnadu Supply Of Pre Shortening Inserts.
Pre Shortening Insert For Rf-361 Draft Gear For Wagon To Drg.no.sr.sk.no.c&w 4244/bg [ Warranty Period: 30 Months After The Date Of Delivery ]

16 May 2024
Odisha Supply Of Track Link Assy, Shoe Bolt Kit, Front Idler Assy For Pc450lc, Track Roller Assy For Pc450lc, Sprocket For Pc 450-7, Sprocket Bolt - Tracklink Assy Other Spares. Qty : 72
14 May 2024