Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Punjab Supply Of N-butanol 2 5 Liter (q3) Qty : 20
11 May 2024
Bihar Supply Of Flange For Sand
Flange For Sand Transporting System As Per Drawing No. Rwp/sand Plant/flange/01. [ Warranty Period: 30 Months After The Date Of Delivery ]

14 May 2024
Meghalaya Construction Of Water Harvesting Structures (wkh)
13 May 2024
Uttar Pradesh Construction Work Of Residual Covered Rcc Drain On The Left Track From Near Naka Intersection Located On Lucknow Ayodhya Main Road To Zebra Park Palhari Intersection.
Estimated Cost :8166000
24 May 2024
Uttar Pradesh Supply Of Eyelet 4 Mm With Washer, Eyelet 7 Mm With Washer Qty : 4403
20 May 2024
Meghalaya Construction Of Water Harvesting Structures At South, Lot-1 And Lot-2.
13 May 2024
Delhi Annual Maintenance Service For Centralised Air Conditioning System. Qty : 1
Estimated Cost :4500000 INR
27 May 2024
West Bengal Supply, Installation And Commissioning Of Cross Bearing Pullers Including Hydraulic Pump Body & Bearing Attachments ; Capacity: 4 Ton, Stroke: 60 Mm, Max. Reach: 224 Mm, Max. Spread: 145 Mm. Make Powerram, Enerpac Or Skf Only Required. [ Warranty Period:
17 May 2024
West Bengal Supply Of Wheel Cyl Assy, Gear Lever Kit, Oil Seal, Oil Filter, Fuel Filter, Fuel Filter Water Separator, Air Filter, Fuel On Off Cock, Gasket, Valve Air Compressor, Hose Air Compressor, Big And Brg Cell - Mt Spares Qty : 14
30 May 2024
Haryana Annual Maintenance Of Swd In Sector 25 Rohtak
Repair Rectification Of Water Supply Line With Di Pipe Slandered Special Etc In Sector 25 Rohtak.

Estimated Cost :169000 INR
20 May 2024