Tenderskhoj
India
- Consultancy Legal
LOCATION SUMMARY DEADLINE
Haryana Interior Works In Our Premises.
06 Jun 2024
Karnataka Design And Construction Of Faecal Sludge Treatment Plant (fstp) At Puttur (15 Kld) And Tarikere (12 Kld) Including Operation And Maintenance Of Constructed Facilities For 5 Years. Package-08 (turnkey Basis)
15 Jun 2024
Karnataka Design And Construction Of Faecal Sludge Treatment Plant (fstp) At Savanur (12 Kld) And Sirsi (15 Kld) Including Operation And Maintenance Of Constructed Facilities For 5 Years. Package-10 (turnkey Basis)
15 Jun 2024
Kerala Pre-feasibility Study For Revamp Of Dhdt Unit At Bpcl Kochi Refinery.
07 Jun 2024
Rajasthan Rate Contract For The Work Of Designing Providing Installation And Commissioning Of Solar Energy Based Borewell Water Pumping Systems Incl Operation And Maintenance For A Period Of 7years In Various Villages Towns Of Phed Region Udaipur
Estimated Cost :44793000 INR
10 Jun 2024
Haryana Interior Works In Our Premises At Khirbhi.
06 Jun 2024
Karnataka Design And Construction Of Faecal Sludge Treatment Plant (fstp) At Mulagunda(6 Kld) And Tekkalakote (06 Kld) Including Operation And Maintenance Of Constructed Facilities For 5 Years. Package-16 (turnkey Basis)
15 Jun 2024
Karnataka Design And Construction Of Faecal Sludge Treatment Plant (fstp) Shahapura 18kld Including Operation And Maintenance Of Constructed Facilities For 5 Years. Package-15 (turnkey Basis)
Design And Construction Of Faecal Sludge Treatment Plant (fstp) At

15 Jun 2024
Karnataka Design And Construction Of Faecal Sludge Treatment Plant (fstp) At Kushtagi (12 Kld) And Chincholi (12 Kld) Including Operation And Maintenance Of Constructed Facilities For 5 Years. Package-14 (turnkey Basis)
15 Jun 2024
Karnataka Construction Of 24 Nos Single Bedded And 24 Nos Double Bedded Residential Accormmodation For Iisc Campus At Kundapura, Challakere, , Karnataka, Including Internal Water Supply, Sanitary Installations, Drainage, Development Work Of Site Bulk Services And I
06 Jun 2024