- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Haryana Supply Of Zero Client With Virtualisation Software, On-grid Solar Power Plant, Digital Notice Board With Signage Software, Delegate Discussion Unit, Chairman Discussion Unit, Controller For Discussion Units, Video Conferencing Camera With Software, Digita
09 May 2024
Punjab Supply Of Cnc Real Machine Operation Simulators - Turning Milling With Fanuc Controller, Cnc Real Machine Operation Simulators - Turning Milling With Siemens Controller, Supply Of Cnc Vertical Machining Centre - Small, Supply Of Cnc Vertical Machining Cen
13 May 2024
Rajasthan Supply Of Field Electrification (15 Kva/ Solar) (q3) Qty : 1
28 May 2024
Tamilnadu Supply Of Solar Power Plant (roof Top) For Ongrid System, Three Phase (q3) Qty : 5
06 Jun 2024
Haryana Selection Of Re Power Developers For Supply Of 1200mw Firm And Dispatchable Power From Ists Connected Renewable Energy Power Projects Coupled With Energy Storage System On Anywhere In India Basis Under Tariff Based Competitive Bidding (tbcb)-ii
24 May 2024
Maharashtra Supply Of Teacher Desk, Teacher Chair, Rainbow Storage, Storage Rack Shelf, Storage Rack Shelf Big, Book Shelf, Chairs For Kids, Flower Table, Round Table, Raw Materials, Lacing Set Wooden, A To Z Capital, A To Z Small, Hindi Consonant, Fruits Puzzle, Tra
Estimated Cost :950000 INR
28 May 2024
Andhra Pradesh Supply Of On Grid Solar Inverter (q3)
Qty : 4

14 May 2024
Kerala Supply, Installation, Scheme Preparation Of Solar Plant With Existing Electrical Connection, Energisation Approval, Testing, Commissioning And Net-meter Connection Of 25kwpon Grid Roof Top Solar Power Plant At Kadakkal Taluk Hospital Kollam
14 May 2024
Andhra Pradesh Land And Power Evacuation Package For Development Of 900mw Ists Connected Solar Pv Projects, Andhra Pradesh With Green Shoe Option Of 300mw.
21 May 2024
Andhra Pradesh Land And Power Evacuation Package For Development Of 900mw Ists Connected Solar Pv Projects In Anantapur, Andhra Pradesh With Green Shoe Option Of 300mw.
23 May 2024