Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Jammu & Kashmir Stage Contract For Maintenance And Upkeep Of Road.
Estimated Cost :400000 INR
06 May 2024
Andhra Pradesh Improvement Of 10 Nos. Limited Height Subway (lhs No.- From 8a To 199a=10 Nos. (8a, 20a, 22a, 43a, 143a, 146a, 157a, 186a, 199a) By Providing C.c Approach Road, Height Gauge Painting Work, Box & Wing Wall Weather Coat Painting, Box Joint Apoxy Grouting, W
Estimated Cost :18614506 INR
16 May 2024
Jammu & Kashmir Stage Contract For Beautification, Upkeep And Routine, Repair Maintenance Of Major Arterial Roads Along With Footpaths And Road Furniture, Under The Territorial Jurisdiction Of (rnb) Sub Division Panthachowk
Estimated Cost :900000 INR
06 May 2024
Delhi Performance Based Maintenance Contract Pbmc For The Stretches From Km 69.90 To Km 84.33 Of Nh 766c And From Km. 0.00 To Km. 1.40 Of Nh 169a Pertaining To National Highway Division Shivamogga In The State Of Karnataka.
Estimated Cost :100219974 INR
18 Jun 2024
Bihar Pbmc Work Nh 527b Old Nh 105 From Chainage Km 14 950 To Km 53 76.
Estimated Cost :332436168 INR
29 May 2024
Assam Rfp For Independent Engineer Services For Supervision Of Widening/improvement To 4 (four) Lane With Paved Shoulder From Ch.5.580km To Ch.25.633km (design Ch.0.000km To Ch.17.737km) For Package-1 Of Bilasipura- Guwahati Road (nh-17) (section: Near Chirakut
09 May 2024
Assam Rfp For Independent Engineer Services For Supervision Of Four Laning Of Silchar (near Nutan Dayapur Village) – Budha Nagar Section Under Package: Sj-1 Of Nh-37 From Existing Km 260+000 (d. Ch.4+560) To Existing Km 233+000 (d. Ch. 24+560) In The State Of A
09 May 2024
India 1. Yelahanka-penukonda Doubling: Carrying Out Balance Work For Extension And Widening Of Existing Rub No 476, Size 1x6x3.80m Rcc Box At Doddaballapura Yard Including Approaches, Construction Of Goods Platform (appx. 45m Length) And Associated P.way Work.
Estimated Cost :49926209 INR
22 May 2024
Nagaland Rfp For Balance Work Four Laning From Km. 132.375 To Km. 153.058 Total New Alignment Design Length-20.683 Of Daboka-dimapur Section Dimapur Bypass On Nh-36 An 39 In The State Of Nagaland On Item Rate And Work Order Basis At The R And C.
07 May 2024
Andaman and Nicobar Islands (UT) Repairs To Drain, Foot Path, Hard Standing, Compound Wall Fencing , Gates And Retaining Wall Etc At Af Stn Under Age Bri Of Ge Brichgunj
Estimated Cost :4000000 INR
20 May 2024