Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Consultancy Services For Ae For Construction Of New 2l Rob In Line Of Lc165b Km 921.450 Between Chondi Basmat Bhendegaon Stations Chainage At 60.780 With Approaches Length From Km 60.179 To 61.278 Of 1.099 Km In The State Of Maharashtra On Epc Mode
Estimated Cost :11033400
17 May 2024
West Bengal Providing Of Manpower Outsourcing Services - Man-days Based - Hiring Of Inspection Agency For Inspection Of Portable Steel Bridge Components As Per Sor 08 Inspector; Highly Skilled; As Per Sor Qty : 2496
30 May 2024
Andhra Pradesh Consultancy Services For Consultant Assisting Authoritys Engineer For Supervision Of Construction Of Flyover At Km 412/800 Rhs Guntur Mirchi Yard Of Nh 544 D Ananthapur - Guntur Road Under Road Safety In The State Of Andhra Pradesh On Epc Mode
17 May 2024
Punjab Protection Of Lmb Bundh And Bridge, Providing Bolder Stone Crated Revetment Along With Pitching On Left Side Of Lmb River Ghaggar At Arnetu Vrb To Save Nearby Abadies And Agricultural Lands Before Flood Season Of 2024 To 25.
Estimated Cost :3000000
16 May 2024
Punjab Providing And Laying B/stone Crated Apron & Pitchng On U/s L/s& R/s And D/s R/s Of Village Hadana Bridge (hadana-deras) On River Ghaggar For Protection Of Bridge Damaged By Floods Of July 2023 To Save Life And Property Of Village Hadana , Etc. Before Floo
Estimated Cost :5000000
16 May 2024
Punjab Repair Of Damaged Bed Bars Of Vr Bridge And Desilting Of Dhauras Lumps And Obstruction Etc On Us Side Of River Ghaggar At Village Mahru Distt Patiala To Save Nearby Abadies And Agricultural Land Before Flood Season Of 2024 To 25
Estimated Cost :200000
16 May 2024
Punjab Providing Revetment And Repairing Studs On Ds Ls Of Vr Bridge On River Ghaggar At Village Mahru Distt Patiala To Save Bandh And Agricultural Land Before The Flood Season 2024 To 25
Estimated Cost :4500000
16 May 2024
Sikkim Construction Of Sub Structure Abutments As Per Drawings For 200 Feet Single Lane Modular Galvanized Steel Bridge At Km 85.130 On Gangtok Chungthang Road As Per Approved Bridge Scheme And Drawings By Executing All Items Of Works Required For Launching Of B
Estimated Cost :9761000 INR
03 Jun 2024
Punjab Construction Of New Rcc Vr Bridge At Rd 6100 Of Momia Drain Near Village Rasoli To Save Nearby Road And Agricultural Land Before The Flood Season Of 2024 To 25
Estimated Cost :4000000
16 May 2024
Punjab Construction Of New Rcc Vr Bridge At Rd 3500 Of Momia Drain Near Village Rasoli To Save Nearby Road And Agricultural Land Before The Flood Season Of 2024 To 25
Estimated Cost :4000000
16 May 2024