Tenderskhoj
India
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Haryana Kalkha Block: Madlauda Panchayat: Kalkha Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Outsourcing Jobwork Persons Rectification Of 3 Ac/pvc Pipe Line The Cost Of Labour , Fitter , Cid Joint, , Nut And Bolt Etc. Complete In All Respect
Estimated Cost :19900 INR
16 May 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Deployment Of Specially Fabricated Hydraulically Operated Machine For Cleaning Of Sewer Manhole Including Hsd, Operator Cum Driver And One Labour Per Days Basis. / Lohia Ba
Estimated Cost :15800 INR
16 May 2024
Bihar Emergency Repair & Testing Of Flood Control Gate.
Estimated Cost :3087803 INR
28 May 2024
Haryana Nain Block: Madlauda Panchayat: Nain Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Outsourcing Jobwork Persons Job Work For Connecting Of Pipeline Excavation With Jointing Cuting Comp. In All Respect. / Work At Nain
Estimated Cost :19500 INR
16 May 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Deployment Of Specially Fabricated Hydraulically Operated Machine For Cleaning Of Sewer Manhole Including Hsd, Operator Cum Driver And One Labour Per Days Basis. / Bhagat S
Estimated Cost :15800 INR
16 May 2024
Tamilnadu Ntpl- Identification And Attending Of Hydrogen Gas Leakage In Unit-1 Generator Hydrogen Gas Coolers
20 May 2024
Delhi Annual Repair & Maintenance Operation Of Elec. Services At Icar-nbpgr, .#* Supply And Charging Of Gas And Fiber Lining In Cooling Tower At Nbpgr (new Building).
Estimated Cost :574040 INR
20 May 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Deployment Of Specially Fabricated Hydraulically Operated Machine For Cleaning Of Sewer Manhole Including Hsd, Operator Cum Driver And One Labour Per Days Basis. / Subhash
Estimated Cost :15800 INR
16 May 2024
West Bengal Temporary Electrical Installation Work For Accommodation Of Capf. Related To Parliamentary Election 2024 Under Contai Electrical Sub-division , Pwd. For Sl No.1. Ps- Mandamoni Coastal Phase-ii , 2. Ps- Digha Phase-ii, 3.ps- Digha Mohana Phase-ii , 4. Ps-
16 May 2024
Tamilnadu Supply And Installation Of 100 Tons Electronic Weigh Bridge
Qty : 1

04 Jun 2024