Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Tripura Repair/maintenance Of Pcc Footpath Garrison Area At Hq 21 Sect Ar .
17 May 2024
Maharashtra Making Of Running Track And Misc. Stage Repair Works At Stadium Of Umrer Township Of Umrer Area.
Estimated Cost :1218718 INR
20 May 2024
Assam Construction Of Balance Work Of The 4- Laning Of The Section From Jhanji To Demowof Nh-37 Pkg-ii Road Works Fromkm 501.800 To Km 514.800 (13.000 Km), Under Sardp- Ne Under Epc Mode.
Estimated Cost :725600000
15 May 2024
Tamilnadu Laying Of Paver Blocks On The Southern Side Of Main Avenue Road
29 May 2024
Delhi Construction Of Balance Work Of The 4- Laning Of The Section From Jhanji To Demow Of Nh-37 Pkg- Iv Structures And Toll Plaza Under Sardp- Ne, Under Epc Mode.
Estimated Cost :213500000
15 May 2024
Bihar Short Term Maintenance Contract (stmc) Work Of Nh 727a From Chainage Km 88.67 (rampur Bujurg) To Km 92.992 (guthani More) For Year 2024-25. ( Total Length 4.322 Km)in The State Of Bihar.
Estimated Cost :8856643 INR
03 Jun 2024
Delhi Construction Of Balance Work Of The 4-laning Of The Section From Jhanji To Demowof Nh-37 Pkg-iii Road Works From Km 514.800 To Km 534.800 (20.000 Km), Under Sardp- Ne , Under Epc Mode.
Estimated Cost :524800000
15 May 2024
Delhi Construction Of Balance Work Of The 4-laning Of The Section From Jhanji To Demow Of Nh-37 Pkg-i Road Works From Km 490.800 To Km 501.800 Under Sardp- Ne Under Epc Mode.
Estimated Cost :660900000
15 May 2024
Maharashtra Design And Construction Of Elevated Road From Kalyan-murbad Road (palms Water Resort) To Badlapur Road (jagdish Dughdhalaya) To Pune Link Road Parallel To Waldhuni River Crossing Over Karjat And Kasara Railway Line Including Slip Road.
20 May 2024
Assam Independent Engineer Services For Four Laning Of Badarpur -churaibari Section Of Nh-37 Nh-8 In The State Of Assam (package-iv) On Hybrid Annuity Mode.
20 May 2024