Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Gujarat Consultancy Services For Dpr For The Work Of Construction Of New Rob (road Over Bridge) Including Approaches & Service Road For Three Rob(s) Under Jurisdiction Of R&b Division In The State Of Gujarat.
14 May 2024
Maharashtra Proposed Construction Of Road Over Bridge In Lieu Of Level Crossing Gate (lc) No 93 (a) 88, 98 Between Lgatpuri – Manmad Section Of Central Railway (two Packet System).
Estimated Cost :873413783 INR
24 May 2024
West Bengal Supply Of 50 Ft Ts Ew Bailey Bridge With Steel Deckding (70r) (q3) Qty : 1
01 May 2024
India Balance Work For Construction Of Four Lane Rob Having Single Span 1x64.05m (bow String Steel Girder) C/c Of Pier And Balance Work Of Approach Of Already Pushed Limited Height Subway Along The Rob In Lieu Of L-xing No.61 At Km 99/23-25 Near Kohand Railway
Estimated Cost :158349963 INR
21 May 2024
Bihar Supplying , Fabrication And Erection Of Hoisting Bridge, Hoisting Arrangement And Approch Ladder In Sultanpur Ghat Link Channel Rd -17.00 Under Water Drainge Division.
Estimated Cost :1911252 INR
04 May 2024
Bihar Fabrication And Erection Of Gates, Embeaded, Hoisting Arrangement, Wellcover, Hoist Bridge At Fulwaria - 1.33km(r/s), Madhu Chhapra-8.94km(r/s), Jhikahiya -14.22 Km In Lalbekiya Right Embankment, & Goabari -2.34 Km In Marginal Bandh And General Maintaenan
Estimated Cost :1663433 INR
04 May 2024
Bihar Fabrication And Erection Of Gates , Embeaded, Hoisting Arrangement, , Hoist Bridge & Approch Ladder At Bela -14.00 Km R/e In Jhim River Right Embankment And Banarjhula -5.88 (l/e) Surhaihiya -15.90 (l/e) In Jhim River Left Embankment Under Bagmati Divisio
Estimated Cost :1742436 INR
04 May 2024
Gujarat Demolition Of Complete Existing Bridge And Construction Of New 4 Lane Fly Over Bridge At Hatkeshwar Junction In Ahmedabad On Epc Basis (design, Engineering, Procurement And Construction).
Estimated Cost :517055226
21 May 2024
Maharashtra Construction Of Minor Bridge On Vadalibhoi To Puri Road Vr 139 Ch 5/900 Tal Chandwad Dist
Estimated Cost :13335691
13 May 2024
Maharashtra Balance Works Under Ss1 Section
Construction And Vertical Extension Of Rubs Approach Walls, Drains Along The Rub, Landscaping, Finishing And Painting, Gratings By Structural Steel And Hume Pipes Laying As Directed In The Ss1 Section By The Engineer,

Estimated Cost :14345531 INR
13 May 2024