Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Chhattisgarh Bid For - Transportation Unloading Of Pond Ash Or Fly Ash From Dyke Or Silo Of Lara Stpp Ash To Bishrampur Open Cast Mine, Custom Bid For Services - Excavation Loading Of Ash, Custom Bid For Services - Levelling Dressing Spreading Of The Transported Ash,
Estimated Cost :356988960 INR
23 May 2024
Maharashtra Construction Of Rob And Lhs At Lc For Elimination Of Manned Lc No. 505 Km 994/27-29 Between Gudma-gondia Stations.
Estimated Cost :312266399 INR
31 May 2024
Jharkhand Provision Of Foot Over Bridge In Place Of Existing Corroded Fob At Lotapahar Railway Stations.
Improvement Of Pf Surface At Barabambo Station In Division.

Estimated Cost :30214367 INR
04 Jun 2024
West Bengal Arc For Expert Services For Maintenance And Inspection Of Bridge Crane Including Travelling Rails In Dcu At Haldia Refinery.
16 May 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sr. Section Engineer (bridge)/cuttack-i And Cuttack-ii Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :12584856 INR
31 May 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sse(bridge)/bhc & Kdjr Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :11016908 INR
31 May 2024
Odisha Zonal Contract (bridge Works) For Hds-prdp Section Under The Jurisdiction Of Sse(bridge)/ctc-ii Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :5668307 INR
31 May 2024
India Request For Proposal (rfp) For Appointment Of Authority Engineer For Providing Project Management Services For Construction Of Double Line Track (3rd & 4th Line) Formation Including Earth Work, Blanketing, Minor Bridges, Major Bridges, Important Bridges,
Estimated Cost :527707504 INR
31 May 2024
India Balance Civil Works , Earth Work In Formation Construction Of Minor Bridges/rub ,side Drain Retaining Wall , Road Etc In Narkher - Nagpur Section In Connection With Itarsi- Nagpur 3rd Line ..
Estimated Cost :421920250 INR
31 May 2024
West Bengal Conversion Of Border Security Fencing From Phase-ii/iii To New Design Fence In West Bengal Between Bp No. 243/mp To 764/2-s (length 210.028 Km) #1. Between Bp. No. 328/4-s To 332/7-s And 347/2-s To 355/2-s (27.709 Km Including Intermediate Bops, Reverine
Estimated Cost :400740 INR
16 May 2024