Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Andhra Pradesh Ya-ndl Section: Elimination Of Level Crossing No.18 At Railway Km. 111/9-10 Between Yerraguntla-proddutur Stations And Diversion Of Traffic Through Road Under Bridge No.477 At Railway Km.111/5-6 Between Yerraguntla-proddutur Stations.
Estimated Cost :12766281 INR
27 May 2024
Maharashtra Provision Of Rubs Maintenance Under Aden/awb, Aden/j And Aden/pau Jurisdictions.
Estimated Cost :8989973 INR
27 May 2024
Maharashtra Earthwork In Embankment & Cutting, Construction Of Minor Bridges (including Rubs), Side Drains & Catchwater Drains And P-way Work (track Linking) & Ballast Supply In The Kalamb-yavatmal Section From Ch. 40700 To Ch. 78200 [excluding Tunnel Approach From C
Estimated Cost :1546325716 INR
27 May 2024
Sikkim Construction Of 140m Span Steel Walkway Steel Foot Bridge 2 Tonne Capacity Along With All Civil Work Across The Teesta River Near Power House Area, Teesta Vi H E Project Sikkim
Estimated Cost :48805784 INR
20 May 2024
India Carrying Out Geotechnical Studies, Preparation Of Construction Of With Lhs & Preparing Detailed Drawings & Design In Connection With Lieu Of Existing Lc No.93 Awr-re Section.
Estimated Cost :4378775 INR
27 May 2024
Uttar Pradesh Balance Work Of Lhs In Cpa - Mrt Section (under Sanctioned Work Of Construction Of Lhs At Different Locations In Cpa-mrt Section Of Izn Division For Elimination Of 11mlcs)
Estimated Cost :84426966 INR
31 May 2024
Andhra Pradesh Gooty-wadi Section: Proposed Replacement Of Rcc Slabs With Psc Slabs (post Tensioned) Bridge No.1198dn,1243 Dn,1248b Dn,1221dn,1228dn,1230dn, 1247dn, 1180 Dn, 1186dn, 1187 Dn And Stc With Rcc Box For Br. No. 1115 Up.
Estimated Cost :55556883 INR
27 May 2024
Bihar Kumedpur-eklakhi-provision Of Rub At Nc-98 Between Kdpr-eki Section
Estimated Cost :33390137 INR
27 May 2024
Rajasthan Construction Of Balance Works (bow String Type Girders Plus Composite Type Girders Plus Psc Girder In Railway Portion From Rob Chainage 1.666 To Chainage 1.871 Total Lenght 205 M At Km 30.00 On Nh 162e Pali Nadol Section Crossing Falna Marwar Railway
Estimated Cost :481200000
20 Jun 2024
Kerala Repair And Maintenance Of Hanging Steel Bridge Across Beeyam Kayal Near Ponnani, Malappuram
13 May 2024