Tenderskhoj
India
- Transportation
LOCATION SUMMARY DEADLINE
Gujarat Supply Of Btpn Discharge Pipe
Flange Fitting Of Btpn Discharge Pipe - Cork Composition Sheet Made By Compounding Of Fine Work Granules With Synthetic Rubber Grade Rc70-c,confirming To Is4253 Pt.ii92008)size:3.2mm [ Warranty Period: 30 Months After T

27 May 2024
Assam Supply Of Foot Rest/ Step Complete Mounting.
Foot Rest/ Step Complete Mounting. Rcf Drg. No. Lw41106 Alt - 'b' [ Warranty Period: 30 Months After The Date Of Delivery ]

18 May 2024
Goa Supply Of Mirror For Wash Basin Led 4inchx8ft 6mm, Fully Automatic Shoe Polish Machine With Sensor Activated 02 Color Dispenser, Apron Self Water Proof With Nwc Logo, Heavy Duty Door Closer For Washroom With 10000 Minimum Operation, Decorative Posters Wit
05 Jun 2024
Uttar Pradesh Supply Of Guard Asm
Guard Asm As Per Drg.no. 10632682 Alt A [ Warranty Period: 30 Months After The Date Of Delivery ]

24 May 2024
Madhya Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Admin; Data Entry Operator, Manpower Outsourcing Services - Minimum Wage - Unskilled; Others; Office Peon, Manpower Outsourcing Services - Minimum Wage - Unskilled; Admin; Mali/gardener,
24 May 2024
Gujarat Supply Of Flux Welding Silver Solder, Twine Sewing Medium Flax, Twine Sewing Fine, Tape Roll Seal Teflon Thread Of 12 Mtr Length, Ear Seal For Protector Plug 3m, Wiper Soft Rubber, Wind Socks, Thinner, S Paper, Heat Resistant Gloves For Galley, Goggles Sa
04 Jun 2024
Karnataka Supply Of Sealing Ring 20mm (for 20 Nb Pipe) Drg. No: Rcf.cc.35318, Alt 'd'. [ Warranty Period: 30 Months After The Date Of Delivery ]
23 May 2024
Uttar Pradesh Supply Of Kit For Isolating Cock
Kit For Isolating Cock To Ftrtipl Pt No-790003101 Consisting Of :- (i) Rubber Ball Seat,ftrtipl Pt. No-003701000a- 02nos/set (ii) O-ring, Ftrtipl Pt. No-003705000a- 01no/set (iii) O-ring, Ftrtipl Pt. No.-001710500a -

21 May 2024
Odisha Supply Of Banner/flexi .
Supply Of Banner/flexi Each Of Size 6 Feet X 4 Feet For World Environment Day 2024 .the Printing Matter Will Be Supplied By Consignee. [ Warranty Period: 24 Months After The Date Of Delivery ]

17 May 2024
Uttar Pradesh Rectification Repair Work Of Pavement At Risk And Cost Of Concessionaire For The Project Of 4 Laning Of Gagalheri Saharanpur Yamunanagar Up Haryana Boarder Section Of Nh-73 From Km. 33.000 Design Ch. 35.400 To Km. 71.640 Design Ch. 86.855 In The State Of
17 Jun 2024