Tenderskhoj
India
- IT GIS / GPS
LOCATION SUMMARY DEADLINE
Uttar Pradesh Request For Proposal For Engagement Of Survey Agencies Having Experience In Land Related Dpr Works For Six Laning Of Etawah-chakeri Project (km. 160.212) Under The Jurisdiction Of Nhai, Piu-kanpur In The State Of Uttar Pradesh.
14 May 2024
Andhra Pradesh Procurement Of Gps Master Clock System Spares For Ntpc Tanda
09 May 2024
Uttar Pradesh Topographical Survey Of Land For Proposed Pmg Residence At Gomti Nagar Up
Estimated Cost :15930 INR
13 May 2024
Odisha Inviting Quotation From Empanelled Surveyors To Undertake Survey, Inspection, Sampling And Analysis Of Pulses And Oil Seeds Commodities (moong, Urad, Gn Pods & Sunflower Seed) To Be Procured In Odisha During Rabi 2024 Assaying Of Pss Stock Has To Be Done
10 May 2024
Tamilnadu Topographical And Ground Penetration Radar Survey Works In Echp Area Of Unit 1 , Unit 2 At 2x660 Mw Sez Stpp
10 May 2024
Haryana Kirawar Block: Bawani Khera Panchayat: Kirawar Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Consultancy Charges Preparation Of Online Case For Providing Raw Water Arrangement For Existing Water Works (unit No. Per Job / Preparation Of
Estimated Cost :35500 INR
08 May 2024
Uttar Pradesh Supply & Commissioning Of Gps Clock At 220 Kv Substation Ghazipur Under Etd.
Estimated Cost :200000 INR
13 May 2024
Uttar Pradesh Pre & Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys Trolley System Or Similar And Development Of Updated Scale Map Between K.m. 0/0 To 24/0 In Dmw-dyp Section, Km 72/0 To 184/0 In Ucr-on Section And Km 71/0 To 94/0 & Km: 103/0 To 144/0 I
Estimated Cost :8089014 INR
31 May 2024
-Oliver-"g"-(overhead-Line-Inspection-With-Video-Recording-And-Gps-Making-System)-As-Per-Rdso-Specification-No.-Is/rdso-ti/0001:2023,-Dated:-22.03.2023-.-Make/brand:-Crystal-Or-Similar-[-Warranty-Period:30-Months-After-The-Date-O"> Jharkhand -Oliver-"g"-(overhead-Line-Inspection-With-Video-Recording-And-Gps-Making-System)-As-Per-Rdso-Specification-No.-Is/rdso-ti/0001:2023,-Dated:-22.03.2023-.-Make/brand:-Crystal-Or-Similar-[-Warranty-Period:30-Months-After-The-Date-O">Supply Of Oliver "g"
Oliver "g" (overhead Line Inspection With Video Recording And Gps Making System) As Per Rdso Specification No. Is/rdso-ti/0001:2023, Dated: 22.03.2023 . Make/brand: Crystal Or Similar [ Warranty Period:30 Months After The Date O

-Oliver-"g"-(overhead-Line-Inspection-With-Video-Recording-And-Gps-Making-System)-As-Per-Rdso-Specification-No.-Is/rdso-ti/0001:2023,-Dated:-22.03.2023-.-Make/brand:-Crystal-Or-Similar-[-Warranty-Period:30-Months-After-The-Date-O">20 May 2024
Karnataka Selection Of System Integrator For Gpon Project (survey, Installation / Repair And A/t Of Gps).
20 May 2024