Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Bihar Construction Of Road Over Bridge.
28 May 2024
Bihar Resetting Of Pontoon Bridge After Repair And Supplying Of Necessary Iron Material And Maintenance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26, 2026-27 & 2027-28 (upto Maintenance Period) Dismentling Of Pontoon Bridge For The
Estimated Cost :165561000 INR
15 May 2024
Bihar Resetting Work Of Pontoon Bridge After Repair And Supplying Of Necessary Iron Material And Maintenance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26 , 2026-27 & 2027-28 Dismentling Of Pontoon Bridge For The Alignment And Stori
Estimated Cost :152594000 INR
15 May 2024
India Construction Of Railway Portion Of Four Lane Road Over Bridge.
Estimated Cost :82683533 INR
23 May 2024
Madhya Pradesh Construction Of Road Over Bridge In Lieu Of Lc No : 27 At Km 1051/1-2 In Saugor – Makroniya Section And Construction Of Road Over Bridge In Lieu Of Lc No 32 At Km/ 1059/2-3 In Makroniya – Lidhora Section And Construction Of Road Over Bridge In Lieu Of Lc
27 May 2024
West Bengal Dtx-koj & Fkm-dbb Repairs To Damaged Portion Works And Dredging Of Silt Of 05 Nos. Major Bridges I.e. 305/435, 298/429, 296/427, 292/420 & 282/407 In Dtx-koj And 16 Nos. Major/minor Bridges I.e. 2, 3, 4, 4a, 5, 5a, 6, 7, 8, 14, 20, 26, 29, 33, 35 & 37 In
Estimated Cost :93109730 INR
29 May 2024
India S & T Work In Connection With Rebuilding Of 13 Nos. Stone Bridge Between Rourkela - Jharsuguda Section.
Estimated Cost :4312394 INR
27 May 2024
Andhra Pradesh Annual Zonal Contract : Repairs And Maintenance Of Works From Chinnaganjam (exclusive) To Krishna Bridge (exclusive) In Aden/bpp Jurisdiction For The Period From 1.7.2024 To 30.6.2025. Sw-ii : Annual Zonal Contract: Repairs And Maintenance Of Works From V
Estimated Cost :15602205 INR
27 May 2024
Andhra Pradesh Ya-ndl Section: Elimination Of Level Crossing No.18 At Railway Km. 111/9-10 Between Yerraguntla-proddutur Stations And Diversion Of Traffic Through Road Under Bridge No.477 At Railway Km.111/5-6 Between Yerraguntla-proddutur Stations.
Estimated Cost :12766281 INR
27 May 2024
Maharashtra Provision Of Rubs Maintenance Under Aden/awb, Aden/j And Aden/pau Jurisdictions.
Estimated Cost :8989973 INR
27 May 2024