Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Haryana Rupana Bishnoia Block: Nathusari Chopta Panchayat: Rupana Bishnoian Annual Mtc. Work F 1 Outsourcing Of Works/ Rectification Of W/s Leakages Job Work Repair Of Pipe Line Including Excavation Bailing Out Water & Refilling Etc Complete In All Respect For 4"
Estimated Cost :19110 INR
06 May 2024
Madhya Pradesh Supply Of Blind Socket Assembly With Locking Arran [blind Socket Assembly With Locking Arrangement Suitable For Inter Vehicle Coupler (zs Coupling 400 A, 750 V) For Lhb Type Drg. No. Lw71302 And Rcf Specification No. Edts-105 (rev-e) With Amdt. 1, 2 & 3 O
09 May 2024
Odisha Supply Of Bogie Centre Pivot Bottom For Boxn & Bcn
Bogie Centre Pivot Bottom For Boxn & Bcn Wagons. As Per Drg.no. Rdso Drg. No. Wd-85079-s-2, Alt. 27 , Item No. 1. Specn: Aar: M 201, Gr. 'c', Carbon 0.32 % Max. And Conforming To Rdso's Spec. Nos. W

09 May 2024
Madhya Pradesh Supply Of Adopter ( For Commode With Elliptical Bottom)as Per Drg. Crws-sk- 953.
Adopter ( For Commode With Elliptical Bottom)as Per Drg. Crws-sk-953. [ Warranty Period: 30 Months After The Date Of Delivery ]

08 May 2024
Karnataka Furnishing Electrical Air Conditioning Works At Chittapur Branch Kalaburagi Ro
13 May 2024
Andhra Pradesh Supply Of Procurement Of Disengageable Second Drive As Per Plasser Part No. Wn81.300-v01-sktl With Annexture _a, Make : Plasser
Disengageable Second Drive As Per Plasser Part No. Wn81.300-v01-sktl With Annexture _a, Make : Plasser

09 May 2024
Maharashtra Supply Of Bottom Cover Complete For Centre Pivot Arrangement As Per Cwm/pl's Drg. No. - C/sk-266/c, Alt- 1 , Confirming To Material M-41/1997 Or Is 2062-2011 E 250 C. [ Warranty Period: 30 Months After The Date Of Delivery ]
11 May 2024
Rajasthan Expression Of Interest For Arjun Industries Ltd Operating In Grinding And Processing Spices.
18 May 2024
Maharashtra Work Of Providing Services Of Persons Through Outsourcing For Various Office Works In Mahagenco For One Year At Mumbai.
Estimated Cost :52770537 INR
24 May 2024
Assam Feasibility Study And Detailed Project Report For Elimination Of Level Crossings With Road Over Bridge At Rm-16,33,116 & 257). Total 04 No's In Rangiya Division.
Estimated Cost :1420753 INR
27 May 2024