Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Assam Feasibility Study And Detailed Project Report For Elimination 15 Nos Of Level Crossing By Provision Of Rob/rub Under The Jurisdiction Of Sr.den/iv/lmg In Division.
Estimated Cost :6313513 INR
10 Jun 2024
West Bengal Erection/launching, Load Testing And Commissioning Of Freshly Supplied Components Of 01 No.160 Ft. Ddr Span Extra Wide Bailey Bridge Conforming To Irc-6 Load Span 30r Loading , Dismantling Of Existing Old Redundant 01(one) No. 160 Ft.(ddr) Span Extra Wide
10 Jun 2024
Uttar Pradesh Part-a :- Provision Of First Fob With Ramp At Karari, Dhaura, Orcha, Barwasagar, Khairar, Singpurdumra, Khurand & Additional Fob With Ramp At Jhansi Station (only 08 Stations). Part-b :- Jhansi Division:-provision Of Tapped Water Supply As Per Mea At Vari
Estimated Cost :1599655 INR
10 Jun 2024
Odisha Regirdering Of Major Bridge No.550dn, 567up, 951dn, 2cp Dn, 4cp Dn, 535a Dn Having Through Open Web Girders/plate Girders Of Bgml/rbg Loading Standard Along With Replacement Of Bearings Of Various Bridges Under The Jurisdiction Of Sr.den(bridge), Khurda R
Estimated Cost :291578669 INR
07 Jun 2024
Madhya Pradesh Soil Restoration & Civil Works At Pariya.
Providing Rcc Inclu Reinforement.
Reinf. Shifting, Bending, Cutting, Placing.
Shuttering Incl.fixing, Packing, Shutter'g.
Providing & Laying Of Pcc.
Deployment Of Excavator Incl.oil,

01 Aug 2024
West Bengal Launching Of Bb At Nhpc Tld Iii Rambi West Bengal
Estimated Cost :950000 INR
10 Jun 2024
Gujarat Supply Of Hot Metal Track Weighbridge, Weighbridge, Scale, Pitless, (500ton Neeach).
19 May 2024
Uttar Pradesh Construction Of 2 Lane Steel/rcc Composite Bridge Over Sstps Discharge Channel And Surya Nallah Street Lighting At Vstps Vindhyanagar. (#1 Providing Services Of Soil Investigation At The Alignment) .#*
Estimated Cost :280000 INR
24 May 2024
West Bengal Tender For Conversion Of Border Security Fencing From Phase Phase Ii/iii To New Design Fence In Wb Between Bp No. 243/mp To 764/2 S Length 210.028 Km Sh Between Bp No. 328/4 S To 332/7 S And 347/ 2 S To 355/2 S 27.709 Km Including Intermediate Bops Reveri
Estimated Cost :400740 INR
20 May 2024
Uttarakhand Construction Of Vented Causeway On Sewer Of Bhalugad Amrit Sarovar. #hindi Image
30 May 2024