Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Uttar Pradesh Construction Of 5 Nos. Vup At Gorakhpur To Up And Bihar Border Section
Construction Of Underpass At Different Locations In The Stretch Of 4- Laning With Service Road In Gorakhpur To Kasia Of Nh-28 In The State Of Uttar Pradesh On Epc Mode Under Road

Estimated Cost :15000
15 May 2024
Maharashtra Strengthening Of Light Vehicle Road By Concreting From Fly Over Bridge No.1 (naigaon) To Fly Over Bridge No.2 (gaurav) At Neeljay Sub Area Of Wani Area.
Estimated Cost :10976085 INR
13 May 2024
Rajasthan Contract For Trd Modification Work In C/w Platform And Fob Work In Bikaner - Ratangarh, Lalgarh - Bathinda, Suratgarh - Sriganganagar - Hanumangarh Including Anupgarh, Hanumangarh - Nohar And Hisar- Sirsa Sections Of Bikaner Division
Estimated Cost :13465701 INR
21 May 2024
Uttar Pradesh Strengthening By Grouting & Jacketing Of Bridge No. 479 Km 701/25-702/5 Under Sr.den/i/pryj
17 May 2024
Rajasthan Earth Work In Bank/cutting Including Blanketing, Construction Of Minor Bridges, Rub/lhs, Fob, Trolley Refuges, Toe Wall, Retaining Wall, Pitching, Station Buildings And Other Structures, Platform, Platform Sheds, Staff Quarters And Other Ancillary Works F
Estimated Cost :2873179885 INR
28 May 2024
Rajasthan Overhead Equipment Work In Connection With Construction Of 2 Lane Rob (2 Nos) At Lc No: 211 & 224 In Kota-mtj Section Of Kota Division.
Estimated Cost :2088561 INR
22 May 2024
Maharashtra Construction Of New Rcc Creek Bridge At Thal - Navgaon Village For Rashtriya Chemicals And Fertilizers Limited Thal.
Estimated Cost :13950531 INR
18 May 2024
Uttar Pradesh Construction Of Major Bridges No.-38 (3x12.20), 40(3x12.20), 46(10x12.20) & 48(4x12.20, Double Line) Composite Girder (without Steel Portion) With Pile Foundation Between Kaptanganj(excl.) - Paniyahwa (incl.) Section In Connection With Doubling Of Gorakhp
Estimated Cost :335888289 INR
06 Jun 2024
Maharashtra Design & Construction Of Elevated Metro Viaduct Of Length Around 17 Km Between Ch 21256 To Ch 38881 Including Railway Spans Of Length 79m & 100m & A 6 Lane Double Decker Portion With Vehicular Underpass In Reach 1a Of Nmrp Phase 2.
Estimated Cost :9450000000 INR
06 Jun 2024
Gujarat Consultancy Services For Third Party Inspection, Quality Assurance And Technical Audit (qata) For Civil Work Construction Of Vehiculer Underpass By Box Pushing Method With Connecting The Approches And Vup With Approaches Near Tri-mandir And Construction O
Estimated Cost :2036000 INR
06 May 2024