Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Set Of Handle Handle Clip Assembly For Box M104 Mk I (q3) Qty : 21190
Estimated Cost :561535 INR
09 May 2024
Uttar Pradesh Supply Of Adjuster Spindle For Irsa-750 Slack Adjuster Of Boxnhl/bcnhl Wagons To Rdso Drg. No. Wd-93061-s-02 & Item No. 03 & Alt. -1 Or Latest Specification 1.) As Per The Rdso Drg No Wd-93061-s-02 & Item No. 03 & Alt. -1 Or Latest. 2.)as Per The Rdso Spe
07 May 2024
Maharashtra Supply Of Wiper Arm Assembly
"wiper Arm Assembly Confirming To Clw Specification No.clw/ac/163." [ Warranty Period: 30 Months After The Date Of Delivery ]

20 May 2024
Andhra Pradesh Supply Of Desk Tops, Laptops, Mini Pc With Cam, Desks With Chairs, Printers Qty : 10
Estimated Cost :500000 INR
20 May 2024
Rajasthan Supply Of Led Indicator, 110v Dc, 22.5mm Dia. White Colour As Per Rdso Specification No.rdso/pe/spec/ac /0184-2015 (rev. 0). Make - Siemens, Group Schnieder, Teknic, Ge, L&t, Eaton,c&s.
Led Indicator, 110v Dc, 22.5mm Dia. White Colour As Per Rdso Sp

06 May 2024
Rajasthan Supply Of Ht Hrc Fuse Link (single Bolted Type) 32 Amp. 3.3/3.6 Kv For 15 Kva Transformer Of Lhb Eog Non-accoaches As Per Cooper Bussmann Cat. No. 3.6 Wdohs 32 Conf. To Rdso Spec. No. Rdso/pe/spec/tl/0158-2010(rev.1). Make Bussmann/l&t/siemens/ge Or Simil
06 May 2024
Andhra Pradesh Supply Of Break Shoe Key As Per Wap7/wag9 Locos.
Break Shoe Key As Per Wap7/wag9 Locos As Per Clw Drg. No.1209.01.316.038 Or Latest (abb Drg. No. Ib 016.00414 Or Latest).

14 May 2024
Maharashtra Supply Of Stopper Assembly For Transverse Back Rest
Stopper Assembly For Transverse Back Rest As Per Rcf Drg No Ae61486 Alt Nil Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]

11 May 2024
Uttar Pradesh Supply Of Pnue. Horn Elgi. Duel Tone Horn Part No 162502/024860 (make: Plasser, Promo, Elgi). [ Warranty Period: 18 Months After The Date Of Delivery ]
06 May 2024
Gujarat Biennial Rate Contract For Maintenance Of Railway Track For Gsecl From Gandhinagar Railway Station To Gandhinagar Thermal Power Station At Gandhinagar Tps For Year 2024-25.
Estimated Cost :10312770
17 May 2024