Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
India Earthwork In Embankment, Blanketing Construction Of Minor Bridges, Rub, Lhs And Other Allied Misc. Works Between Araria Court Station (exc.) To Mirzapur Station In Connection With Construction Of New B.g. Rail Line.
Estimated Cost :990413175 INR
06 Jun 2024
India Construction Of Rub Of Size 30.5 M At Already Closed Lc No. 54 Km 60/1-2 In Between Idgah-bayana Rail Line Pushin Technique.
Estimated Cost :14400000 INR
18 Jun 2024
Odisha Reconstruction Of 3 Nos. Of Damaged Bridges Of Nh-326 At Toyaput Nallah At Ch. Km 261/060, Khudipadar Nallah At Ch. 268/780 Km And Debagarh River At Ch. 270/260 Km On Nh-326 In The State Of Odisha. (bid Ref No. 59 Ce Nh Of 2023-24).
Estimated Cost :376700000
20 Jun 2024
Delhi Development Of Biodiversity Park At Jharoda Mazara And Wazirabad.
Restoration Of The Bamboo Bridge And Other Miscellaneous Works At Yamuna Biodiversity Park.

Estimated Cost :3680976 INR
30 May 2024
Uttarakhand Rfp For The Work Of Construction Of Tunnel/cavity Car Parking At Kempty Fall Mussoorie On Nh-707a (mussoorie To Chakrata) Under District Tehri Garhwal In The State Of Uttarakhand On Epc Mode
04 Jun 2024
India Construction Of One Rub Of Internal Size 4.00mx2.50m Between Km 221/2-4 In Bllimora-amalsad Section And Construction Of Another Rub Of Internal Size 4.00mx2.50m Between Km 223/0-2 In Amalsad -vedchha Section.
Estimated Cost :77599726 INR
11 Jun 2024
India Rfp For Appointment Of Safety Consultant For Construction, Operation & Maintenance Of Z-morh Tunnel Including Approaches On Srinagar Sonamarg Section Connecting National Highway No. 1 In The Ut Of J&k On Dbfot Annuity Basis
24 May 2024
Karnataka Replacement Of Steel Girder For Bridge No. 422 At Km 0/800-900 (b-line And Shunting Neck) Between Bengaluru (sbc) - Yesvanthpur (ypr) Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
Estimated Cost :26117051 INR
06 Jun 2024
Karnataka Proposed Construction Of Rcc Drain In Connection With The Work Of "through Ballast Recoupment Of Points And Crossings - 6 Points In Dodbele (dbl) Yard And 4 Points In Hirehalli (hhl) Yard (total 10 Nos., )". Sw Ii : Bengaluru - Sampige Road Sec : Construc
Estimated Cost :27325081 INR
06 Jun 2024
Odisha Execution Of Zonal Works (for Bridge Repair Works) In Dungripali (in) - Deogaon Road (in) Section And Balangir(ex) - Sonepur(in) Section For The Period Ending 30.06.2025 Under Aden/balangir.
Estimated Cost :7425367 INR
06 Jun 2024