Tenderskhoj
India
- Infrastructure Building
LOCATION SUMMARY DEADLINE
Haryana Estimate For Costruction Of Additional Rooms For Waste Water Sample Testing At First Fl 1 Electrical Items/ Pvc Wire Black 02 / At Site Division Lab
2 Electrical Items/ Pvc Wire Black 1.5 / At Site Division Lab
3 Electrical Items/ Pvc Wire Bla

Estimated Cost :41135 INR
29 Apr 2024
Kerala Construction Of Permanent Campus For Iit Palakkad Under Phase 1a Providing And Laying Cement Concrete Interlocking Paver Blocks Around Water Treatment Plant, Rear Side Of Kedaram And Parking At Classroom Cum Laboratory Complex (c06) At Sahyadri Campus.
06 May 2024
Haryana Estimate For Costruction Of Additional Rooms For Waste Water Sample Testing At First Fl 1 Electrical Items/ Fan Belt Fan Belt / Blank/at Site Division Lab
2 Electrical Items/ Fan Regulator Fan Regulator / 01 M /at Site Division Lab
3 Electrica

Estimated Cost :49129 INR
29 Apr 2024
Uttar Pradesh Construction Of Kasturaba Gandhi Balika Vidhalaya (academic And Hostal) Of Block-q.
Estimated Cost :35115000 INR
13 May 2024
Uttar Pradesh Construction Of Kasturaba Gandhi Balika Vidhalaya (academic And Hostal) Of Block-q.
Estimated Cost :35115000 INR
13 May 2024
Chhattisgarh Essential Civil Modification & Renovation Works In Partportion Of First Floor For Proposed Cld Including Construction Of Attached Toilet For R.o. Head Chamber & Modification Of Existing Store Room Into Ladies & Gents Toilet Block At Ground Floor For Renti
Estimated Cost :806856 INR
30 Apr 2024
West Bengal Temporary Arrangement Of Drinking Water Facilities With Pvc Water Storage Tank Of 2000 Litre Capacity Including Construction Pf One No Pedestal And Carrying Of Drinking Water By Hired Vehicle Equipt With Water Tank During Loksabha General Election 2024 Fo
07 May 2024
Maharashtra Construction Of Central Administrative Building At Junnar Tal.junnar Dist.pune (including Electrical Work)
Estimated Cost :274420278 INR
10 May 2024
Odisha Construction Of 40 Nos Of E Type Quarters (2 Blocks Of S_5) At District Court Complex At Phulbani
Estimated Cost :99999998 INR
07 Jun 2024
Uttar Pradesh Construction Of Kasturaba Gandhi Balika Vidhalaya (academic And Hostal) Of Block-rani Ki Sarai.
Estimated Cost :35115000 INR
13 May 2024